Tender Details

Particulars Details
Title
Assessment Of Ground Borne Vibrations To Establish A Criterion Of Design Of Track Form System For Vibration Mitigation Measures For Line 10 Of Phase Iv Corridor.
Description
Assessment Of Ground Borne Vibrations To Establish A Criterion Of Design Of Track Form System For Vibration Mitigation Measures For Line 10 Of Phase Iv Corridor.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id 2024_DMRC_834995_1
Reference
Number
DT -18
Tender Fee 5900
EMD 1 Lakh
Tender Value
Place Delhi
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=877511
Start Date December 03, 2024 16:30
End Date

10/12/2024 ( Expired 160 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.

Design, manufacture, supply, installation, testing and commissioning of radio system of line 9 (from dahisar east to rai) and 7a(andheri east to csmia) corridor of mumbai metro including dongri depot.

Read more
Construction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system&amp#x0d for 5177.98 ha. of cca including&amp#x0d command area development (cad)&amp#x0d of salandi left main canal from rd&amp#x0d 59.970 km to 60.304 km through&amp#x0d under ground pipe line irrigation&amp#x0d system (gravity flow) of abp

Read more
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale

Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale

Read more
Construction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system&amp#x0d for 4924.04 ha. of cca including&amp#x0d command area development (cad)&amp#x0d of salandi left main canal from rd&amp#x0d 49.810 km to 59.970 km through&amp#x0d under ground pipe line irrigation&amp#x0d system (gravity flow) of abp

Read more
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Read more
Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec

Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec

Read more
Procurement of k9 di pipe for laying of rising main pipe line for damra to mohishila and barachak of asansol under amrut1.0 (phase iv) within amc

Procurement of k9 di pipe for laying of rising main pipe line for damra to&amp#x0d mohishila and barachak of asansol under amrut1.0 (phase iv) within amc

Read more
Construction of distribution system for 5052.68 ha. of cca including command area development (cad) of salandi left main canal from rd 60.304 km to 71.505 km through under ground pipe line irrigation system (gravity flow) of abp

Construction of distribution system&amp#x0d for 5052.68 ha. of cca including&amp#x0d command area development (cad)&amp#x0d of salandi left main canal from rd&amp#x0d 60.304 km to 71.505 km through&amp#x0d under ground pipe line irrigation&amp#x0d system (gravity flow) of abp