Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Manpower Under S R To Conservation Of Mosque And Tomb Of Shah Abdul Razak And His Four Sons At Jhinjhana
|
Description |
Supply Of Manpower Under S R To Conservation Of Mosque And Tomb Of Shah Abdul Razak And His Four Sons At Jhinjhana
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_ASI_781011_1 |
Reference Number |
Nort/Meer/Saha/Mosq/17437007 |
Tender Fee | 0 |
EMD | 49021 |
Tender Value | |
Place | OFFICE OF THE SA ASI MEERUT CIRCLE |
Link | https://eprocure.gov.in |
Start Date | November 14, 2023 23:30 |
End Date |
04/12/2023 ( Expired 527 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreRestoration or face-lifting of the front and side of factory building including lifting/ removal of plants and trees from the wall, parapet, roof etc. at old s r mint
Restoration or face-lifting of the front and side of factory building including lifting/ removal of plants and trees from the wall, parapet, roof etc. at old s r mint
Read moreSpecial repairs to cold cool room (p-44) against ber of capacity 9tr and 4 tr at bvy under ge (seabird) karwar
Special repairs to cold cool room (p-44) against ber of capacity 9tr and 4 tr at bvy under ge (seabird) karwar
Read moreSpecial repairs to electric meter panel of bldg no. p-01 to p-07 at kadamba vamam and p-30 to p-38 at little binaga and special repairs to lt cables of tech bldg at nad under ge (seabird) karwar
Special repairs to electric meter panel of bldg no. p-01 to p-07 at kadamba vamam and p-30 to p-38 at little binaga and special repairs to lt cables of tech bldg at nad under ge (seabird) karwar
Read moreMaintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Read moreUpgradation of rural road from sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay
Upgradation of rural road form sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb23, length 1.372 km)
Read moreof your Industry type