Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Widening Of Nh 366 (Old Nh 17 A) From Sada Junction (Km 14/90) To Gate No. 1 Of Mpt (Km16/00).
|
Description |
Widening Of Nh 366 (Old Nh 17 A) From Sada Junction (Km 14/90) To Gate No. 1 Of Mpt (Km16/00).
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_756379_1 |
Reference Number |
13/1/2023_24/PWD/WDXIV/ NH/ASW/09 Date 05/06/2023 |
Tender Fee | 1800 |
EMD | 26.5 Lakh |
Tender Value | |
Place | O/o Chief EngineerNHRB, PWD, Altinho, Panaji, Goa |
Link | https://eprocure.gov.in |
Start Date | June 06, 2023 17:30 |
End Date |
20/07/2023 ( Expired 700 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Read moreRepair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand
Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreDoor to door collection, segregation,transportation of municipal solid waste up to processing site for ward no.1 to 14 mc kanina.
Door to door collection, segregation,transportation of municipal solid waste up to processing site for ward no.1 to 14 mc kanina.
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreWidening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab
Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab
Read moreImprovement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Improvement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Read moreof your Industry type