Tender Details

Particulars Details
Title
Construction Of Authority Engineers Office And Site Laboratory In Connectioinwith The Redevelopment Of Varkala Sivagiri Railway Station
Description
Construction Of Authority Engineers Office And Site Laboratory In Connectioinwith The Redevelopment Of Varkala Sivagiri Railway Station
Organisation Kerala Rail Development Corporation Ltd. | State Govt. and UT
Tender Id 2024_KRDCL_665671_1
Reference
Number
KRDCL/VAK/Con/2024/03
Tender Fee 5000
EMD 77700
Tender Value
Place KRDCL 5th Floor Trans Towers Vazhuthacaud Tvm
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1033772
Start Date March 01, 2024 00:25
End Date

14/03/2024 ( Expired 434 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project

Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project

Read more
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Read more
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up

Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Construction railway rob at km. 3.485 along parali bypass on deogaon fata_parali_latur_omerga_road nh 548b in the state of maharashtra.

Construction railway rob at km. 3.485 along parali bypass on deogaon fata pathri_sonpeth_parali_ambajogai_renapur fata_latur_omerga_road nh 548b on epc mode in the state of maharashtra.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise