Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cleaning Works Of Syphons Across Power Channel Stage Iv During Monsoon From Asan Barrage To Kulhal Dehradun
|
Description |
Cleaning Works Of Syphons Across Power Channel Stage Iv During Monsoon From Asan Barrage To Kulhal Dehradun
|
Organisation | MD- UJVN | State Govt. and UT |
Tender Id | 2024_UJVN_69791_1 |
Reference Number |
35/EE/PCM/Dhalipur/ 2023-24 |
Tender Fee | 2360 |
EMD | 63600 |
Tender Value | |
Place | Executive Engineer PCM Dhalipur Dehradun |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=83846 |
Start Date | February 26, 2024 22:30 |
End Date |
11/03/2024 ( Expired 463 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreOutsourcing of jobs for daily cleaning, sweeping of roads, paths, open spaces and to attend day to day complaints of wood work, electricity, water supply and sanitary and civil works repair etc. in power colony 1, pspcl, patiala.
Outsourcing of jobs for daily cleaning, sweeping of roads, paths, open spaces and to attend day to day complaints of wood work, electricity, water supply and sanitary and civil works repair etc. in power colony 1, pspcl, patiala.
Read moreConstruction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Construction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Read morePeakload man power
Engaging of 18 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - iii, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 19 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - ii, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read morePeakload man power
Engaging of 19 nos. technical assistants (skilled) for each section to assist om staff at the fuse off call office for attending emergency works during peak load hours in operation division zone - i, visakhapatnam for a period of two years i.e from 01.07.2025 to 30.06.2027 (24 months)
Read moreRoutine maintenance and opening communication (during monsoon and winter season) from km 176 to 192 of nh-707a in the state of uttarakhand under stmc 2025-26
Routine maintenance and opening communication (during monsoon and winter season) from km 176 to 192 of nh-707a in the state of uttarakhand under stmc 2025-26
Read moreProviding interconnection to water supply pipeline across gudivada channel at bc hostel ending road from puli jayapradha house to patcha seetha ramaswamy house near rcm church in ward no.13 of gudivada municipality est:5,55,000/- fund: general
Providing interconnection to water supply pipeline across gudivada channel at bc hostel ending road from puli jayapradha house to patcha seetha ramaswamy house near rcm church in ward no.13 of gudivada municipality est:5,55,000/- fund: general
Read moreof your Industry type