Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Strengthening Of Asan Barrage Bridge,Head Regulator Bridge Along Asan Barrage And Steel Motorable Bridge Across Power Channel Dhalipur.
|
Description |
Strengthening Of Asan Barrage Bridge,Head Regulator Bridge Along Asan Barrage And Steel Motorable Bridge Across Power Channel Dhalipur.
|
Organisation | MD- UJVN | State Govt. and UT |
Tender Id | 2025_UJVN_81692_1 |
Reference Number |
30/EE/PCM/Dhalipur/ 2024-25 |
Tender Fee | 17700 |
EMD | 7.43 Lakh |
Tender Value | |
Place | Excutive Engineer, PCM, Dhalipur |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97411 |
Start Date | April 04, 2025 17:00 |
End Date |
26/04/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreConstruction of iconic hybrid cable stayed and suspension bridge across krishna river on nh 167k design chainage km 87.360 to km 88.437 in the states of telangana and andhra pradesh on epc basis
Construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh 167k design chainage km 87.360 to km 88.437 in the states of telangana and andhra pradesh on epc basis
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreProcurement of steel material for life enhancement and structural strengthening job of conveyor-2a1 and 2b1 under chp-mm dept., ktps through capex 25-26
Procurement of steel material for life enhancement and structural strengthening job of conveyor-2a1 and 2b1 under chp-mm dept., ktps through capex 25-26
Read moreDevelopment of bulk drug park at una distt. una (h.p.) sh- construction of steam generation and distribution network along with power generation.
Sh- construction of steam generation and distribution network along with power generation.
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreSupply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes
Supply, installation, configuration, testing and commissioning of network infrastructure deployment across various substations and the rhq under powergrid eastern region-ii along with all the accessories, laying of cables and pvc pipes
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreof your Industry type