Tender Details

Particulars Details
Title
Balance Work For The Sanctioned Work Cess Repair Of Bg Bank Under The Jurisdiction Of Aden/Rpan Having Project Id 08.04.31.22.3.53.008.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 83443763
Reference
Number
45-ENGG-RNY-2025-26
Tender Fee 0
EMD 2.18 Lakh
Tender Value -
Place Guwahati
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83443763/viewNitPdf_5064378.pdf

Start Date August 09, 2025 00:14
End Date
Expired 01/09/2025

Expired 412 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Sw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)

Sw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)

Read more
Aden/hq/ii subdivision - bank protection work like toe wall, pitching and cess repair works in do-ggc section.

Aden/hq/ii subdivision - bank protection work like toe wall, pitching and cess repair works in do-ggc section.

Read more
Custom bid for services - at rny division ohe (non-core activity) maintenance work in jurisdiction of ulg and rpan depot of bg iii sections ohe depot for 02 (two) years

Custom bid for services - at rny division ohe (non-core activity) maintenance work in jurisdiction of ulg and rpan depot of bg iii sections ohe depot for 02 (two) years

Read more
Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm

Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm

Read more
Nanded division- sse/pway/ned jurisdiction: proposed safety related yard improvement & upgradation works at various yards(cru,lbg,ned,mtdi & mgc-5 yards), (balance -track works)(irpsm project id : 11.04.31.25.3.53.006)

Nanded division- sse/pway/ned jurisdiction: proposed safety related yard improvement & upgradation works at various yards(cru,lbg,ned,mtdi & mgc-5 yards), (balance -track works)(irpsm project id : 11.04.31.25.3.53.006)

Read more
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc

Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc

Read more
Provision of new six no. of rooms with lath bath facilities, gym, store and repair to door, tiles in existing rooms with colour wash and painting in loco running room at sog under jurisdiction of aden/sog (balance work).

Provision of new six no. of rooms with lath bath facilities, gym, store and repair to door, tiles in existing rooms with colour wash and painting in loco running room at sog under jurisdiction of aden/sog (balance work).

Read more
Cost of balance civil engineering works :- construction of relay room (3.1m x 3.1m), ips room (3.1m x 3.7m) and dg/battery room (3.1m x 3.7m) at lc no. 59 (smi-rga) and at lc no.142 (caa-ppa), 25 (nke-camu), 09 (jubs-patr) in the jurisdiction of sr.den/ii/spj in connection with interlocking of lc gate 34 nos having tvu more than 20 thousand in spj division.

Cost of balance civil engineering works :- construction of relay room (3.1m x 3.1m), ips room (3.1m x 3.7m) and dg/battery room (3.1m x 3.7m) at lc no. 59 (smi-rga) and at lc no.142 (caa-ppa), 25 (nke-camu), 09 (jubs-patr) in the jurisdiction of sr.den/ii/spj in connection with interlocking of lc gate 34 nos having tvu more than 20 thousand in spj division.

Read more
Ohe modification work against sanctioned ph-30 works over firozpur division in c/w (i)- construction of lhs of internal size 5.0m x 5.0m at manned l-xings no. a-5 on vka-dbnk section by pushing method in the section under aden-ii/asr, (ii)- construction of lhs having internal size 1 x 5.0m x 5.0m by pushing method at km 4/14-15 on vka-dbnk section and (iii)-provision of lhs 3.00m x 2.50m in lieu of tress passing location at km 39/3-4 in bat yard on asr-ptk section.

Ohe modification work against sanctioned ph-30 works over firozpur division in c/w (i)- construction of lhs of internal size 5.0m x 5.0m at manned l-xings no. a-5 on vka-dbnk section by pushing method in the section under aden-ii/asr, (ii)- construction of lhs having internal size 1 x 5.0m x 5.0m by pushing method at km 4/14-15 on vka-dbnk section and (iii)-provision of lhs 3.00m x 2.50m in lieu of tress passing location at km 39/3-4 in bat yard on asr-ptk section.

Read more
Cess repairs under jurisdiction of aden/west/ckp

For complete deion and other details, please refer to tender

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise