Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Filling Work Of Ponds On Both Sides Of Nawabpura Crossing In Ward No. 21
|
| Description |
Filling Work Of Ponds On Both Sides Of Nawabpura Crossing In Ward No. 21
|
| Organisation | DLB | State Govt. and UT |
| Tender Id | 2026_DLB_549306_1 |
|
Reference Number |
Nit 55/2025 wo no 1 |
| Tender Fee | 1000 |
| EMD | 25740 |
| Tender Value | - |
| Place | municipal corporation alwar |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=979262 |
| Start Date | March 31, 2026 15:30 |
| End Date |
Expired
10/04/2026
Expired 189 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Earthwork (soil filling) on both sides of the drain from mahroofpur road to pyare boundary in ward no. 11 sardar vallabhbhai patel.
Earthwork (soil filling) on both sides of the drain from mahroofpur road to pyare boundary in ward no. 11 sardar vallabhbhai patel.
Read moreWard 04 bitumen work and filling on both sides extending from the corner of rajesh patel kirana store up to chanda sheikh liler
Ward 04 bitumen work and filling on both sides extending from the corner of rajesh patel kirana store up to chanda sheikh liler
Read moreEarthwork (soil filling) on both sides of the drain from rajendra house to high tension line in ward no. 16 dehdani dr. rajendra nagar.
Earthwork (soil filling) on both sides of the drain from rajendra house to high tension line in ward no. 16 dehdani dr. rajendra nagar.
Read moreConstruction of ghat at rd 37400 of bazida distributory both sides
Construction of ghat at rd 37400 of bazida distributory both sides
Read moreConstruction of precast rcc drains on both sides of the road in ward-56, spanning from pillokhadi pul to lisadi gate crossing and from bhumiya pul to p.n. bank.
Construction of precast rcc drains on both sides of the road in ward-56, spanning from pillokhadi pul to lisadi gate crossing and from bhumiya pul to p.n. bank.
Read moreIn ward no. 15 abdul kalam nagar, construction work of cc road and drain cover on both sides from shambhu agrahari house on the market road with drain cover on both sides.
In ward no. 15 abdul kalam nagar, construction work of cc road and drain cover on both sides from shambhu agrahari house on the market road with drain cover on both sides.
Read moreContinuous computer stationery with sprocket holes on both sides and perforation at its depth. size:
Continuous computer stationery with sprocket holes on both sides and perforation at its depth. size:
Read moreHigh pressure hose pipe size 5/16 inch, length15 meters long with connector (both sides end fittings) end fittings with o ring type straight with 27 a/f nut both sides suitable for water jets.
High pressure hose pipe size 5/16 inch, length15 meters long with connector (both sides end fittings) end fittings with o ring type straight with 27 a/f nut both sides suitable for water jets.
Read moreP/fixing 60mm thick interlocking tiles at side berms of both sides of ghora road w.no30.
P/fixing 60mm thick interlocking tiles at side berms of both sides of ghora road w.no30.
Read moreRoad improvement work by microsurfacing on both sides from rajnagar extension square to hindon metro station.
Road improvement work by microsurfacing on both sides from rajnagar extension square to hindon metro station.
Read moreof your Industry type