Tender Details

Particulars Details
Title
Loading Arrangement At 2 Bay Gantry
Description
Loading Arrangement At 2 Bay Gantry
Organisation Hindustan Petroleum Corporation Limited | Public Sector Undertakings
Tender Id 127571
Reference
Number
2400015283-HD-07100
Tender Fee 0
EMD 0
Tender Value
Place Rewari
Link http://tenders.hpcl.co.in/tenders/tender_prog/Tenders_details.asp?id=127571
Start Date August 20, 2024 15:30
End Date

16/09/2024 ( Expired 270 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda

Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda

Read more
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Subsea production system

Subsea production system at chandrika and gs-49 kakinada eoa

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Read more
Housekeeping and catering services

Housekeeping and catering services at mpsja

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Transgrid project gis6 attapady and ramakkalmedu green energy corridor substation package

220 kv gis substation at mannarkad 220 kv gis substation at agali 220 kv gis substation at nirmala city 110 kv gis substation at pushpakandam two nos of 110kv ais bays at nedumkandam and vazhathope

Read more
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise