Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sitc Of Ultrasonography Colour Doppler Machine Wth 3 Years Warranty And 5 Year Cmc
|
| Description |
Sitc Of Ultrasonography Colour Doppler Machine Wth 3 Years Warranty And 5 Year Cmc
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2024_MCGM_1071285_1 |
|
Reference Number |
HO/4099/RNCH |
| Tender Fee | 1000 |
| EMD | 50000 |
| Tender Value | - |
| Place | H B T Medical College and Dr R N Cooper Hospital |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1871251 |
| Start Date | August 19, 2024 21:30 |
| End Date |
Expired
20/09/2024
Expired 752 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Read moreSupply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Supply, installation of 500 lph ro plant with 3 yrs cmc after completion of warranty period at kkocp, mm area.
Read moreDesign, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Design, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.
Read moreSupply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreProcurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Read moreof your Industry type