Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Road From Kanmora Saha Para Via Dhabona To Mahisimordini Than Pitch Point Within Rajnagar Block Length 7.700 Km
|
| Description |
Construction Of Road From Kanmora Saha Para Via Dhabona To Mahisimordini Than Pitch Point Within Rajnagar Block Length 7.700 Km
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_PRD_556059_11 |
|
Reference Number |
09/SE/RRNMU-Bwn-Circle/2023-24 (1st Call) |
| Tender Fee | 0 |
| EMD | 9.52 Lakh |
| Tender Value | - |
| Place | Office of the SE, RRNMU, Bardhaman Circle |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 10, 2023 23:00 |
| End Date |
Expired
04/09/2023
Expired 1135 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of leach pit 12 nos at amlachaturi, nijhuri, kabilashpur, tarasole, sirsha, ahmmedpur ,sirsha, mahishagram, mujrasole, dhabona, kanmora muslimpara awc and tarasole ssk, bhabanipur g.p. area under rajnagar dev. block year 2023-24
Construction of leach pit 12 nos at amlachaturi, nijhuri, kabilashpur, tarasole, sirsha, ahmmedpur ,sirsha, mahishagram, mujrasole, dhabona, kanmora muslimpara awc and tarasole ssk, bhabanipur g.p. area under rajnagar dev. block year 2023-24
Read moreHt nut and bolt 17 pitch 1 point mm length 2 inch,ht nut and bolt 19 pitch 1 point 5 mm length 3 in
Read more
Construction of concrete road from choto bansar pitch road to kalibandh pitch road via kalindi para, length-2 km(15th cfc 2023-24)
Construction of concrete road from choto bansar pitch road to kalibandh pitch road via kalindi para, length-2 km(15th cfc 2023-24)
Read morePeriodical renewal of completed pmgsy road from t-05 barpathari-rajnagar road to paul para (l049) (length-0.962 km) under rajnagar r.d. block within the jurisdiction of rajnagar sub-division, pwd(randb) during the year 2023-24.
Patch metalling, pot holes repairing, re-carpeting etc. ch. from 0.00 km to 0.962 km.
Read moreConstruction of cc cover drain with soakpit with discharge point from culvert of saha para more to canal activity id 56137336
Construction of cc cover drain with soakpit with discharge point from culvert of saha para more to canal activity id 56137336
Read moreMaintenance of different roads under amc ward no_ 4 during the year 2024_2025_(1)periodical repairing road of drug control (length is 75.00 mtr) (ii) patch repairing road of bramaan para, gowala basti, saha para ,ghosh para ( length is 1.00 km) (iii
Maintenance of different roads under amc ward no_ 4 during the year 2024_2025_(1)periodical repairing road of drug control (length is 75.00 mtr) (ii) patch repairing road of bramaan para, gowala basti, saha para ,ghosh para ( length is 1.00 km) (iii
Read moreConstruction of road from suara pitch road to adibasi para via radhesyampur within g. ghati block in the district of bankura length 5.60 km
Construction of road from suara pitch road to adibasi para via radhesyampur within g. ghati block in the district of bankura length 5.60 km
Read moreConstruction road from mirpur malayda ghumti pitch road to adibasi para via muslim para covering 2 km within gotan gp in the block raina-ii under rastashree-ii 2023-24, length-2.000 km
Construction road from mirpur malayda ghumti pitch road to adibasi para via muslim para covering 2 km within gotan gp in the block raina-ii under rastashree-ii 2023-24, length-2.000 km
Read morePeriodical repair of the ujan dudpur road to ujan dudpur road via acharjee para total length equals to 700 point 00 mtr point point during the year 2023 24 point sh patch gsb comma patch metelling comma grouting comma carpeting etc
Periodical repair of the ujan dudpur road to ujan dudpur road via acharjee para total length equals to 700 point 00 mtr point point during the year 2023 24 point sh patch gsb comma patch metelling comma grouting comma carpeting etc
Read moreMtc of road from malaynagar jarulbachai road starting from nihar chakraborty house to towards saha para and bulan dey tilla length 1 point 00 km under dukli sub-division pwd randb during the year 2024-25/ sh patch wbm carpeting road side drain and ot
Mtc of road from malaynagar jarulbachai road starting from nihar chakraborty house to towards saha para and bulan dey tilla length 1 point 00 km under dukli sub-division pwd randb during the year 2024-25/ sh patch wbm carpeting road side drain and ot
Read moreof your Industry type