Tender Details

Particulars Details
Title
Nctps I Se Mi Circle Boiler Maintenance Division Annual Overhaulwork For The Year 25 26 Specification No 57 25 26
Description
Nctps I Se Mi Circle Aoh 25 26 Bm Unit I Complete Removal Of Worn Out Damaged Insulation In Boiler Drum Down Comer Pipe Line 6 Nos Ring Header Areas During Annual Overhaul Long Shutdown And Relaying Of Insulation While Unit In Service
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_574311_1
Reference
Number
CE SE MI NCTPS I 57 25 26
Tender Fee 0
EMD 62300
Tender Value -
Place Works
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=686177

Start Date July 01, 2025 23:40
End Date
Expired 04/07/2025

Expired 429 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
No.03(4th call)/se/ic/kmr/2026-27, dt:23-04-2026 advilingal dam-mi in division no: telangana-superintending engineer, irrigation circle,kamareddy.

No.03(4th call)/se/ic/kmr/2026-27, dt:23-04-2026 advilingal dam-mi in division no: telangana-superintending engineer, irrigation circle,kamareddy.

Read more
Nctps i se mi circle boiler maintenance division specification no 305 25 26

Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 26 25 26

Nctps i se mi circle aoh 25 26 bm dn unit i boiler flue gas duct b pass removal of existing insulation in the flue gas duct during overhaul to facilitate for modular replacement if flue gas duct and relaying the insulation

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 25 25 26

Nctps i se mi circle aoh 25 26 bm dn unit i boiler flue gas duct a pass-removal of existing insulation in the flue gas duct during overhaul to facilitate for modular replacement if flue gas duct and relaying the insulation as original after erection

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 201 25 26

Nctps i se mi circle aoh 25 26 bm dn unit iii rectification of damaged sagged radiant roof tubes by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing sheet

Read more
Nctps i se mi circle boiler maintenance division repair maintenance work for the year 25 26 specification no 198 25 26

Nctps i semi circle r m 25 26 bm dn unit ii overhauling of water wall soot blower module by replacing worn-out spares and bring back into service.

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 200 25 26

Nctps i se mi circle aoh 25 26 bm dn unit iii reconditioning of defective coal nozzles coal tip and hard facing of reconditioned coal nozzle coal tips for boiler burner overhauling works for the year 2025 26

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 229 25 26

Nctps i se mi circle aoh 25 26 bm dn unit ii renewal of long term overheated hrh coil 9 nos 33 to 41 during annual overhaul for the year 2025 26

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 227 25 26

Nctps i se mi circle aoh 25 26 bm dn unit ii overhaul of esp 2 streams during annual overhaul for the year 2025 26

Read more
Nctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 228 25 26

Nctps i se mi circle aoh 25 26 bm dn unit ii rectification of damaged sagged radiant roof tubs by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise