Tender Details

About Tender

🛣️ Invitation For Bids: Road Maintenance Services In Mandwi Sub Division 🛣️ The Chief Engineer, Pwd (R And B), State Govt. And Ut, Invites Bids From Eligible Contractors For The Maintenance Of Roads Under Mandwi Sub Division In Jirania For The Year 2024 25. The Scope Of Work Includes Sh Grouting, Patch Re Carpeting, Tack Coat, Seal Coat, Wire Crates, Clearing Of Drains, Stripping Of Excess Soil, And Other Allied Works As Per Group G Specifications. 📅 Bid Submission Deadline: July 22, 2024, 3:00 Pm Tender Fee: Inr 1000 Emd: Inr 48,520 Interested Bidders Should Possess The Necessary Qualifications And Experience In Road Maintenance And Construction Projects. Detailed Bids Must Include Technical And Financial Proposals, Adhering To The Tender Guidelines And Government Procurement Norms. Keywords: Road Maintenance, Mandwi Sub Division, Pwd (R And B), Jirania, Group G, Tender, Bid Submission, Infrastructure Development
Particulars Details
Title
Maintenance Of Different Roads Under Mandwi Sub Division In The During The Year 2024 25 Sh Grouting, Patch Re Carpeting, Tack Coat, Seal Coat, Wire Crates, Clearing Of Drains, Stripping Of Excess Soil And Other Allied Works Etc. Group G.
Description
Maintenance Of Different Roads Under Mandwi Sub Division In The During The Year 2024 25 Sh Grouting, Patch Re Carpeting, Tack Coat, Seal Coat, Wire Crates, Clearing Of Drains, Stripping Of Excess Soil And Other Allied Works Etc. Group G.
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2024_CEPWD_50530_1
Reference
Number
46/R/DNIeT/EE-JRN/PWD(R and B)/2024-25
Tender Fee 1000
EMD 48520
Tender Value
Place Jirania
Link https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=51372
Start Date July 03, 2024 14:30
End Date

22/07/2024 ( Expired 275 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)

Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)&amp#x0d &amp#x0d

Read more
Periodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)

Periodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)

Read more
Fdr of various roads under the jurisdiction of kalyanpur pwd(randb) sub-division. / sh- brick soling, earth filling, patch metalling, re-carpeting, cd etc during the year 2025-26.

Fdr of various roads under the jurisdiction of kalyanpur pwd(randb) sub-division. / sh- brick soling, earth filling, patch metalling, re-carpeting, cd etc during the year 2025-26.

Read more
Fdr urgent protection of different mi schemes under karbook and silachari rd block area sh providing palasiding gunny bags wire crates desilting and earthfilling etc during the year 2025 26

Fdr urgent protection of different mi schemes under karbook and silachari rd block area sh providing palasiding gunny bags wire crates desilting and earthfilling etc during the year 2025 26

Read more
Pr of dupatacherra pwd road to bhavona mandir, ch0.00 km to ch0.750 km(length0.750 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026 sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat etc.

Pr of dupatacherra pwd road to bhavona mandir, ch0.00 km to ch0.750 km(length0.750 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026 sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat etc.

Read more
Maintenance of road from td road to ciyarai para from ch.0.00 km to ch.2.00 km total length 2.00km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling, patch carpeting, seal coating, pucca drain, surface drain etc

Maintenance of road from td road to ciyarai para from ch.0.00 km to ch.2.00 km total length 2.00km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling, patch carpeting, seal coating, pucca drain, surface drain etc

Read more
Mtc. of road kanchanpur-jalabassa road to gangini kunda, ch0.00 km to ch0.500 km(length0.500 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026/sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat

Mtc. of road kanchanpur-jalabassa road to gangini kunda, ch0.00 km to ch0.500 km(length0.500 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026/sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat

Read more
Maintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para from ch.0.00km to ch.2.30km total length 2.30km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal

Maintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para from ch.0.00km to ch.2.30km total length 2.30km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal

Read more
Mtc. of road sadaihampara pwd road to sukiyakarbari para, ch0.00 km to ch0.650 km(length0.650 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026/sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat

Mtc. of road sadaihampara pwd road to sukiyakarbari para, ch0.00 km to ch0.650 km(length0.650 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026/sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat

Read more
Maintenance of road from damcherra khedacherra road to tabjirai para from ch.0.00km to ch.0.90 km total length 0.90 km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal coating, surfac

Maintenance of road from damcherra khedacherra road to tabjirai para from ch.0.00km to ch.0.90 km total length 0.90 km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal coating, surfac

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise