Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Salwala Sataun Road Km. 0/00 To 9/610. (Sh C/O 5/7 Mtr Wide Road I/C Cross Drainage Works, P/L Gsb, G Ii, G Iii, Tarring, Road Side Drain, C/O Parapets And Providing Road Signage Etc. In Km. 0/00 To 9/610) Under Nabard Ridf Xxxix
|
Description |
Construction Of Salwala Sataun Road Km. 0/00 To 9/610. (Sh C/O 5/7 Mtr Wide Road I/C Cross Drainage Works, P/L Gsb, G Ii, G Iii, Tarring, Road Side Drain, C/O Parapets And Providing Road Signage Etc. In Km. 0/00 To 9/610) Under Nabard Ridf Xxxix
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_94053_1 |
Reference Number |
TA-5035-5134 dt.-7-10-2024 |
Tender Fee | 5000 |
EMD | 28.63 Lakh |
Tender Value | |
Place | Shillai |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=138450 |
Start Date | October 09, 2024 15:30 |
End Date |
18/10/2024 ( Expired 234 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
C/o 76.00 meter single span steel truss (through type) bridge over tailing nallah at km. 2/900 on up-gradation of main road to ratil from km. 0/000 to 9/330 under pmgsy-iii batch-i package no.hp-07-161 a.
C/o 76.00 meter single span steel truss (through type) bridge over tailing nallah at km. 2/900 on up-gradation of main road to ratil from km. 0/000 to 9/330 under pmgsy-iii batch-i package no.hp-07-161 a.
Read moreGeneral-kavalangadu grama panchayath- m l a - a d s - 2 0 2 3 - 2 0 2 4 - k o t h a m a n g a l a m l a c - construction of approach road k u d a m u n d a b r i d g e i n kavalangad and varapetty grama panchayath-general civil work
Side protection,approach road, drainage
Read moreR/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- p/l gsb, g-iii and bc at rd 9/200 to 9/350 and seal coat in various rds damages due to disaster.
R/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- p/l gsb, g-iii and bc at rd 9/200 to 9/350 and seal coat in various rds damages due to disaster.
Read moreGeneral improvement to meppayyur cheruvannur p a n n i m u k k u a v a l a a n d a p p r o a c h t o g u l i k a p u z h a b r i d g e r o a d b w k m 0 000 4 000 and 6 500 9 400 general civil work general civil work
O r m a t i o n w i d e n i n g s i d e p r o t e c t i o n w o r k a n d&#x0d bm and abcd bc concrete culvert and drainage works road safety&#x0d measures&#x0d
Read moreC/o jeepable road to khawangi kanda 0/00 to 2/400 (sh-rofd,p/l soling, metalling and tarring from km 0/00 to 2/500)
C/o jeepable road to khawangi kanda 0/00 to 2/400 (sh-rofd,p/l soling, metalling and tarring from km 0/00 to 2/500)
Read moreC/o 67.30 mtr span box cell bridge over singaroo khad at rd 1.300 and c/o 22.00 mtr span rcc t beam bridge over tilagan khad at rd 8.610 on salwala sataun road under nabard ridf xxxix.
Prepartion of structural design and drawings and accord its approval there of.
Read moreConstruction of link road nh 154 to dhanotu via bad basti km 0/000 to 3/670 in district kangra (hp) under nabard ridf-xxx (nabard)
Sh formation cutting, passing places, retaining walls, cross drainage work, providing and laying granular sub base, wbm-ii, wbm-iii, tarring work, cement concrete pavement, side drain and parapets) including five year maintenance after completion
Read moreR/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- p/l gsb, g-iii and bc at rd 9/200 to 9/350 and seal coat in various rds damages due to disaster.
R/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- p/l gsb, g-iii and bc at rd 9/200 to 9/350 and seal coat in various rds damages due to disaster.
Read moreMt on shaheed sudesh marg from subathu to village chapla gp shadyana road in km. 0/00 to 4/525
Mt on shaheed sudesh marg from subathu to village chapla gp shadyana road in km. 0/00 to 4/525.(sh removal of formation deficiency, retainning structures, pl cross drainage works, p/l gsb, wmm, tarring, v shape side drain, c/o parapets, road sign boa
Read moreC/o link road from rungchampo to sharakpi via thoroge in g.p. kalpa km. 0/00 to 1/500 (sh- providing and laying g-iii and premix carpet from km. 0/00 to 1/500 and protection work
C/o link road from rungchampo to sharakpi via thoroge in g.p. kalpa km. 0/00 to 1/500 (sh- providing and laying g-iii and premix carpet from km. 0/00 to 1/500 and protection work
Read moreof your Industry type