Tender Details
Particulars | Details |
---|---|
Title |
1211/Mp25 Pmjm02/Morena
|
Description |
Construction/Up Gradation Of Rural Roads Under Pmgsy Including Maintenance For Five Year After Construction Pmjanman
|
Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
Tender Id | 2024_MPRRD_137244_1 |
Reference Number |
MP25PMJM02 |
Tender Fee | 11800 |
EMD | 98255 |
Tender Value | |
Place | Morena |
Link | https://pmgsytendersmp.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=215950 |
Start Date | December 17, 2024 16:30 |
End Date |
31/12/2024 ( Expired 134 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction of major bridge over river umngot under nesids (roads)
Construction of major bridge including immediate approaches over river umngot on jongksha-kharang-dienglieng-nongjrong-moodymmai-wahiajer road, meghalaya under nesids (roads) (length - 110 m)
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreRequest for pre qualification of bidders for maintenance works to be taken up on risk and cost of the concessionaire or contractor under the jurisdiction of ro jaipur
Request for pre qualification of bidders for maintenance works to be taken up on risk and cost of the concessionaire or contractor under the jurisdiction of ro jaipur
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreof your Industry type