Tender Details

Particulars Details
Title
B.T. Renewal Works On (1) Gorsari, Mirgauti Road Length 5.40 Km. (2) Sagauni Majhgawan Road Length 2.70 Km. (3) Adarsh Gram Jattaha Tola Approach Road 2.00 Km. And (4) Bari Semari Obari Khokham Road Length 5.00 Km. Total Length 15.10 Km. Under
Description
B.T. Renewal Works On (1) Gorsari, Mirgauti Road Length 5.40 Km. (2) Sagauni Majhgawan Road Length 2.70 Km. (3) Adarsh Gram Jattaha Tola Approach Road 2.00 Km. And (4) Bari Semari Obari Khokham Road Length 5.00 Km. Total Length 15.10 Km. Under
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_398498_1
Reference
Number
28.04-SATNA-2024-25
Tender Fee 13812
EMD 1.11 Lakh
Tender Value
Place satna
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=469504
Start Date January 30, 2025 15:30
End Date

14/02/2025 ( Expired 65 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
B.t. renewal work on navra to ghagharla road in km 1/2 to 4/6 total 3.60 km

B.t. renewal work on navra to ghagharla road in km 1/2 to 4/6 total 3.60 km

Read more
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district

Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district

Read more
General-routine maintenance 2024-25 -rc1-cluster 1-one year running contract for various pwd roads under roads section kozhenchery - zone 1 in pathanamthitta dist- 4 road stretches for a total length of 12.055 km-general civil work

General-routine maintenance 2024-25 -rc1-cluster 1-one year running contract for various pwd roads under roads section kozhenchery - zone 1 in pathanamthitta dist- 4 road stretches for a total length of 12.055 km-general civil work

Read more
General-rm 2024-25-rc1-cluster 1 - one year running contract for various pwd roads under roads section pulincunnu -zone 1-in alappuzha district 2 road stretches for a total length of 6.80 km.-general civil work

General-rm 2024-25-rc1-cluster 1 - one&amp#x0d year running contract for various pwd roads&amp#x0d under roads section pulincunnu -zone 1-in&amp#x0d alappuzha district 2 road stretches for a total&amp#x0d length of 6.80 km.-general civil work

Read more
For special strengthening work of 1. alejhari kaspur road length- 1.50 km 2. garra-ekodi road length - 2.00 km 3. kalagota- pipariya road length-2.20 km 4. wara-alejhari road length- 5.00 km total length - 11.70 km.

For special strengthening work of&amp#x0d 1. alejhari kaspur road length- 1.50 km&amp#x0d 2. garra-ekodi road length - 2.00 km&amp#x0d 3. kalagota- pipariya road length-2.20 km&amp#x0d 4. wara-alejhari road length- 5.00 km total length - 11.70 km.

Read more
A/r and m/o on churag to kalti road km. 0/00 to 4/00 (sh providing and laying built up spray grout in km. 2/00 to 3/00) a/r and m/o on chindi bakhras road km. 0/00 to 2/600 (sh providing and laying built up spray grout in km. 0/00 to 1/00)

A/r and m/o on churag to kalti road km. 0/00 to 4/00 (sh providing and laying built up spray grout in km. 2/00 to 3/00) a/r and m/o on chindi bakhras road km. 0/00 to 2/600 (sh providing and laying built up spray grout in km. 0/00 to 1/00)

Read more
Rate contract for supply, erection, testing , commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i on turnkey basis for fy 2025-26

Rate contract for supply, erection, testing , commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i on turnkey basis for fy 2025-26

Read more
Rate contract for supply, erection, testing, commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i for fy 2025-26 labour only

Rate contract for supply, erection, testing, commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i for fy 2025-26 labour only

Read more
General-rm 2024-2025 rc1-cluster 1-0ne year running contract for various pwd roads under roads section thiruvalla - zone -2 in pathanamthitta district- 5 road stretches for a total length of 8.31 km-general civil work

General-rm 2024-2025 rc1-cluster 1-0ne&amp#x0d year running contract for various pwd roads&amp#x0d under roads section thiruvalla - zone -2 in&amp#x0d pathanamthitta district- 5 road stretches for a&amp#x0d total length of 8.31 km-general civil work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise