Tender Details
Particulars | Details |
---|---|
Title |
Printing Of Rolling In/Out Inspection Book With Spiral Binding Consisting Of 100 Sheets Printed On Both Sides
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106496655 |
Reference Number |
53246037 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Allahabad |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106542828/viewNitPdf_4793338.pdf |
Start Date | December 03, 2024 17:49 |
End Date |
09/12/2024 ( Expired 134 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreOperation and maintenance of facilities/ amenities (kiosk only) at maroud toll plaza (km.45.500) on both sides (lhs and rhs) under highway nest (mini) on kodebod-dhamtari section of nh 30 in the state of chhattisgarh under hnm
Operation and maintenance of facilities/ amenities (kiosk only) at maroud toll plaza (km.45.500) on both sides (lhs and rhs) under highway nest (mini) on kodebod-dhamtari section of nh 30 in the state of chhattisgarh under hnm
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreInterlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.
Interlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWork of laying tiles on both sides near shri ram krishna temple and chandalal park temple in ward no. 89 sanganer zone
Work of laying tiles on both sides near shri ram krishna temple and chandalal park temple in ward no. 89 sanganer zone
Read moreProviding and fixing of 10 nos. ss sinnate / retro reflective printed sign board on both sides in nit faridabad.
Providing and fixing of 10 nos. ss sinnate / retro reflective printed sign board on both sides in nit faridabad.
Read moreIn scheme 13 of the authority, road asphalting work by paver finisher on the road on both sides of aajan canal.
In scheme 13 of the authority, road asphalting work by paver finisher on the road on both sides of aajan canal.
Read moreof your Industry type