Tender Details
Particulars | Details |
---|---|
Title |
Printing Of Rolling In/Out Inspection Book With Spiral Binding Consisting Of 100 Sheets Printed On Both Sides
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106496655 |
Reference Number |
53246037 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Allahabad |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106542828/viewNitPdf_4793338.pdf |
Start Date | December 03, 2024 17:49 |
End Date |
09/12/2024 ( Expired 156 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of drains on both sides of road in islam nagar in front of the graveyard in manpur road from naseem siddiquis house via anwar khans house to kallu murga wales house in ward 09 maihar
Construction of drains on both sides of road in islam nagar in front of the graveyard in manpur road from naseem siddiquis house via anwar khans house to kallu murga wales house in ward 09 maihar
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWork of tree shifting and maintenance as per requirement on both sides of the road at various places in the development authority area.
Work of tree shifting and maintenance as per requirement on both sides of the road at various places in the development authority area.
Read moreAr and mo residential building during the year 2025 26 sh replacement of one way vission glass film including printing and black one way vission film with necessary accessories as fixed on existing 5 mm transparent acrylic sheet in front of differen
Ar and mo residential building during the year 2025 26 sh replacement of one way vission glass film including printing and black one way vission film with necessary accessories as fixed on existing 5 mm transparent acrylic sheet in front of differen
Read moreConstruction work of covered drain on both sides of phoolwali gali in ward maulviganj 1 from fatehpur barabanki road to baradari mosque/culvert.
Construction work of covered drain on both sides of phoolwali gali in ward maulviganj 1 from fatehpur barabanki road to baradari mosque/culvert.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreProtection to road on both sides of culvert on road leading to soliem cacora in curchorem constituency.
Protection to road on both sides of culvert on road leading to soliem cacora in curchorem constituency.&#x0d
Read moreof your Industry type