Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Internal Lighting Work For Uttar Pradesh Defence Industrial Corridor Updic Lucknow Node Up
|
Description |
Construction Of Internal Lighting Work For Uttar Pradesh Defence Industrial Corridor Updic Lucknow Node Up
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPEID_873448_1 |
Reference Number |
5853 DT. 20-12-23 |
Tender Fee | 2714 |
EMD | 24.88 Lakh |
Tender Value | |
Place | Executive Engineer, P.I.U-2, UPEIDA, Ruchi |
Link | https://etender.up.nic.in |
Start Date | December 27, 2023 17:30 |
End Date |
16/01/2024 ( Expired 535 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreRequest for proposal (rfp) for developing, setting up, operating and maintaining bare commercial spaces at various metro station of lucknow metro.
Request for proposal (rfp) for developing, setting up, operating and maintaining bare 
 commercial spaces at various metro station of lucknow metro.
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreKnppd-08
Rfp for developing, setting up, operating and maintaining commercial spaces through 
 licensing at various metro stations of corridor-1 (iit kanpur-kanpur central) of uttar pradesh metro 
 rail corporation network at kanpur.
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreDevelopment of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program
Development of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreof your Industry type