Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
For Procurement And Installation Of New Diesel Gen125 Kva, Shifting And Installation Of 50 Kva Genset(ghb),Shifting And Installation Of 20 Kva Genset(fci) From Old Ghb Office To New Market Complex At Porvorim
|
| Description |
For Procurement And Installation Of New Diesel Gen125 Kva, Shifting And Installation Of 50 Kva Genset(ghb),Shifting And Installation Of 20 Kva Genset(fci) From Old Ghb Office To New Market Complex At Porvorim
|
| Organisation | Goa Housing Board | State Govt. and UT |
| Tender Id | 2025_GHB_24399_1 |
|
Reference Number |
GHB/TECH/EE/1099/2025 |
| Tender Fee | 10720 |
| EMD | 65402 |
| Tender Value | |
| Place | Porvorim, Goa |
| Link |
View Original Tender Notice
https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=24822 |
| Start Date | September 03, 2025 16:00 |
| End Date |
Expired
24/09/2025
Expired 271 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, shifting and installation of 250 kva dg from shahdara east, gzb to sector-19, noida and 600 kva dg from sector-19, noida to shastri nagar, meerut.
Dismantling, shifting and installation of 250 kva dg from shahdara east, gzb to sector-19, noida and 600 kva dg from sector-19, noida 
 to shastri nagar, meerut.
Read moreShifting installation testing and commissioning of 1x15 kva eicher make ea from te store kandharapur to te. harraiya and associated work in oa azamgarh ba gorakhpur olt site
Shifting installation testing and commissioning of 1x15 kva eicher make ea from te store kandharapur to te. harraiya and associated work in oa azamgarh ba gorakhpur olt site
Read moreLac-ads-guruvayur lac 2025-26-supply installation testing and commissioning of 160 kva dg at newly constructed court complex, chavakkad.-work-general electrical work
Lac-ads-guruvayur lac 2025-26-supply installation testing and commissioning of 160 kva dg at newly constructed court complex, chavakkad.-work-general electrical work
Read moreConstruction of rcc nala from to near saksham associates for nehru market at ward no. 23
Construction of rcc nala from to near saksham associates for nehru market at ward no. 23
Read moreSupply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hoste
Supply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hostel at csir ccmb
Read moreA/r and m/o works to delhi govt. residential complex, d-ii vasant kunj, new delhi during 2026-2027 (sh- water proofing treatment and urgent repair of broken water lines at delhi govt. residential complex, d-ii vasant kunj, new delhi).
A/r and m/o works to delhi govt. residential complex, d-ii vasant kunj, new delhi during 2026-2027 (sh- water proofing treatment and urgent repair of broken water lines at delhi govt. residential complex, d-ii vasant kunj, new delhi).
Read moreSpecial repairs / replacement of existing old vintage electrical lt /street light rcc poles convert to street lights poles at khadki complex area beg and centre under ge (central) khadki.
Special repairs / replacement of existing old vintage electrical lt /street light rcc poles convert to street lights poles at khadki complex area beg and centre under ge (central) khadki.
Read moreBeautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Read moreExecution work for shifting of line at village basgaon to bhitauli and vishunpur to singha on semi turnkey basis in deposit head under electricity distribution division kauriram, gorakhpur
Execution work for shifting of line at village basgaon to bhitauli and vishunpur to singha on semi turnkey basis in deposit head under electricity distribution division kauriram, gorakhpur
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreof your Industry type