Tender Details

Particulars Details
Title
Detailed Survey, Designing And Drawing, Construction Of Weir With Allied Work Etc. All Complete Job For Construction Of Weir Check Dam On Banai River For Murhu Block Rural Water Supply Scheme Under D.W. And S. Division, Khunti On Turnkey Basis
Description
Detailed Survey, Designing And Drawing, Construction Of Weir With Allied Work Etc. All Complete Job For Construction Of Weir Check Dam On Banai River For Murhu Block Rural Water Supply Scheme Under D.W. And S. Division, Khunti On Turnkey Basis
Organisation DWSD EinC | State Govt. and UT
Tender Id 2024_DWSD_93686_1
Reference
Number
DWSD/KHUNTI-08(WEIR)/2023-24, 4th Call
Tender Fee 10000
EMD 3.34 Lakh
Tender Value
Place KHUNTI
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=126187
Start Date September 23, 2024 18:30
End Date

28/09/2024 ( Expired 281 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta- phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513

Supply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta - phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513

Read more
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Read more
Hiring of tata sumo or equivalent vehicle 1 no. for official purpose on monthly basis for one year under d.w. and s. division, adityapur

Hiring of tata sumo or equivalent vehicle 1 no. for official purpose on monthly basis for one year under d.w. and s. division, adityapur

Read more
Work of 11 kv independent feeder for issuing 200 kva new connection in village santha of 33-11 kv s-s kirawali town under jal jeevan mission on semi turnkey basis in full deposit scheme under the area of electricity distribution division, kiraoli

Work of 11 kv independent feeder for issuing 200 kva new connection in village santha of 33-11 kv s-s kirawali town under jal jeevan mission on semi turnkey basis in full deposit scheme under the area of electricity distribution division, kiraoli

Read more
Survey, soil investigation, planning, designing, building construction, obtaining allrelevant permissions and occupancy certificatefrom concerned local authority on lump-sum turnkey basis for redevelopment of cs no. 175 (pt),193(pt),s. no. 42

Survey, soil investigation, planning, designing, building construction, obtaining allrelevant permissions and occupancy certificatefrom concerned local authority on lump-sum turnkey basis for redevelopment of cs no. 175 (pt),193(pt),s. no. 42

Read more
Construction of 33 kv ug line with xlpe cable along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.

Construction of 33 kv ug line with xlpe cable along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.

Read more
Detailed survey, designing and drawing, construction of weir with allied works etc. all complete job for arkosa and adjoining villages rural water supply scheme under d.w. and s. division lohardaga

Detailed survey, designing and drawing, construction of weir with allied works etc. all complete job for arkosa and adjoining villages rural water supply scheme under d.w. and s. division lohardaga

Read more
Survey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free

Survey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free

Read more
Design, supply, installation, testing and commissioning (on turnkey basis) of construction of lift water supply scheme for haittimatha post 3472 yellow flower including 05 years operation and maintenance, watch and ward under sdp package 4575. comp

Design, supply, installation, testing and commissioning (on turnkey basis) of construction of lift water supply scheme for haittimatha post 3472 yellow flower including 05 years operation and maintenance, watch and ward under sdp package 4575. comp

Read more
Construction of 05 units toilets and construction of boring with installation of hand pump with platform on the occasion of shrawani mela 2025 under d.w. and s. division deoghar for the year 2025-26

Construction of 05 units toilets and construction of boring with installation of hand pump with platform on the occasion of shrawani mela 2025 under d.w. and s. division deoghar for the year 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise