Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Beautification Work Of Park Under Amar Lok Colony In Zone 3 Tajganj Room No. 63.
|
Description |
Beautification Work Of Park Under Amar Lok Colony In Zone 3 Tajganj Room No. 63.
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 200 |
EMD | 16484 |
Tender Value | |
Place | AGRA |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 18:30 |
End Date |
23/06/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreModification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreSpecial repair to building no p-3/83 (01 to 08) and p-3/84 (05 to 08) or md accn of med regt at mil stn jammu under ge satwari
Special repair to building no p-3/83 (01 to 08) and p-3/84
 (05 to 08) or md accn of med regt at mil stn jammu
 under ge satwari
Read moreAddition and alteration of old spark range building in zone-i at tbrl range ramgarh under ge (i) rnd chandigarh
Addition and alteration of old spark range building in zone-i at tbrl range ramgarh under ge (i) rnd chandigarh
Read moreof your Industry type