Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Roads, Laying Of Water Supply And Sewerage Line In Newly Carved Out Pockets 3 Nos In Sector1, Pataudi
|
| Description |
Construction Of Roads Including Earth Work In Embankment, Preparation Of Sub Grade, Providing And Laying Of Prime Coat An Tack Coat, Gsb, Wmm, Bm Mc 100mm Id Cidi Pipe For Water Supply Line, Providing And Laying Of 200mm Id Sw Pipes For Sewerage Incl
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HBC_319752_1 |
|
Reference Number |
Job No. 35/2023/EE-IV/HSVP/GGM |
| Tender Fee | 3000 |
| EMD | 4.01 Lakh |
| Tender Value | - |
| Place | Office of EE-IV, HSVP, Gurugram |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | October 11, 2023 22:30 |
| End Date |
Expired
26/10/2023
Expired 1085 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Balnce work providing sewerage scheme to left out nadaun town and left out area nadaun town in tehsil nadaun distric hamirpur
Balnce work providing sewerage scheme to left out nadaun town and left out area nadaun town in tehsil nadaun distric hamirpur
Read moreLeasing out newly constructed hp.pwd rest house near dhanotu chowk under hppwd gohar division (sh engagement of various staff to efficiently run the pwd rest house and expenditures of water supply charges, electricity charges and garbage charge for o
Leasing out newly constructed hp.pwd rest house near dhanotu chowk under hppwd gohar division (sh engagement of various staff to efficiently run the pwd rest house and expenditures of water supply charges, electricity charges and garbage charge for o
Read moreDevelopment of integrated infrastructure facilities like roads (1st stage), s. w. drainage system, water supply distribution and sewerage network for 40.50m wide road from sector - 1 to 7 at palghar (east) new town, dist. palghar(half carriageway).
Development of integrated infrastructure facilities like roads (1st stage), s. w. drainage system, water supply distribution and sewerage network for 40.50m wide road from sector - 1 to 7 at palghar (east) new town, dist. palghar(half carriageway).
Read moreTtps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Ttps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Read moreConstruction of one nos. sewerage disposal sump well with motor and motor room at gate no. 05 and construction of one nos. rainwater disposal sump well with submersible motor for pumping out rainwater from low lying area including ward no.10,mcg
Construction of one nos. sewerage disposal sump well with motor and motor room at gate no. 05 and construction of one nos. rainwater disposal sump well with submersible motor for pumping out rainwater from low lying area including ward no.10,mcg
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for begusarai-samastipur road (sh-55) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for begusarai-samastipur road (sh-55) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for naugachia-udakishanganj road (sh-58) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for naugachia-udakishanganj road (sh-58) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for gaya-rajauli road (sh-70): 6-lane (3-lane on each side) at one location in the state of bihar.
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for gaya-rajauli road (sh-70): 6-lane (3-lane on each side) at one location in the state of bihar.
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for akbarnagar-amarpur road (sh-85): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for akbarnagar-amarpur road (sh-85): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreof your Industry type