Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying Of Water Supply Line, Sewerage Line And Construction Of Roads In Newly Carved Out Pocket In Sector 9, Gurugram
|
| Description |
Appointment For Technical Consultancy For Providing Transaction Advisory Services, Preparation Of Structural Design And Vetting From Iit Nit. Detail Estimate And Dnit, Geotechnical Survey, Plumbing And Electrical For Proposed Working Women Hostel In
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HBC_305596_1 |
|
Reference Number |
Job 18/2023/EE-IV/HSVP/GGM/Rein |
| Tender Fee | 250 |
| EMD | 10000 |
| Tender Value | - |
| Place | Office of EE-IV, HSVP, Gurugram |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | August 22, 2023 20:30 |
| End Date |
Expired
30/08/2023
Expired 1138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cc roads and cc drains in ward 8, 9 and 10 of wyra municipality (6 th call)
Construction of cc roads and cc drains in ward 8, 9 and 10 of wyra municipality (6 th call)
Read moreA) replacement of 200mm dia sewerage line from 3-4-3/19/g/a to 3-4-63-19/a/1 in sreeramanapuram street no.1, b) replacement of old agede 200mm dia sewerage sewer line from h.no.3-4-63/19/92 to 3-4-63/19/67 in sreeramanpuram, c) laying and jointing of sewerage sewer line from grave yard to 3-4-63/19/53 in sreeramanapuram under uppal ward, uppal circle-9, uppal zone-ii
A) replacement of 200mm dia sewerage line from 3-4-3/19/g/a to 3-4-63-19/a/1 in sreeramanapuram street no.1, b) replacement of old agede 200mm dia sewerage sewer line from h.no.3-4-63/19/92 to 3-4-63/19/67 in sreeramanpuram, c) laying and jointing of sewerage sewer line from grave yard to 3-4-63/19/53 in sreeramanapuram under uppal ward, uppal circle-9, uppal zone-ii
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ghogha-panjwara road (sh-84): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ghogha-panjwara road (sh-84): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for akbarnagar-amarpur road (sh-85): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for akbarnagar-amarpur road (sh-85): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraiya-motipur road (sh-86) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraiya-motipur road (sh-86) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for runnisaidpur-biswa road (sh-87): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for siswan-siwan road (sh-89) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for siswan-siwan road (sh-89) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for udakishanganj-birpur road (sh-91): 6-lane (3-lane on each side) at two locations in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for udakishanganj-birpur road (sh-91): 6-lane (3-lane on each side) at two locations in the state of bihar
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraigarh-parwaha road (sh-92): 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraigarh-parwaha road (sh-92): 6-lane (3-lane on each side) at one location in the state of bihar
Read moreof your Industry type