Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cs For Independent Engine For Construction Of Strr (West Side) (I) Kunagal Thattekere From Km 79.0000 Km112.600 With Length Of 33.6 Km Pkg 1.(Ii)bagganadoddi S.Mudugadapalli From Km120.980 23.44 Km In The State Of Karnataka Tn On Ham Under Bmp Pkg 3
|
| Description |
Cs For Independent Engine For Construction Of Strr (West Side) (I) Kunagal Thattekere From Km 79.0000 Km112.600 With Length Of 33.6 Km Pkg 1.(Ii)bagganadoddi S.Mudugadapalli From Km120.980 23.44 Km In The State Of Karnataka Tn On Ham Under Bmp Pkg 3
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_145897_1 |
|
Reference Number |
NHAI/KNT/STRR/Phase-II/ Pkg-1-3/IE/2023/191113 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | 0 |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | February 17, 2023 17:25 |
| End Date |
Expired
15/01/2024
Expired 893 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of strr(west side)nh948a obalapura (nelamangala taluk))to somakkanamutta(magadi taluk) from km0.000 to km46.300(design)phase i pkg i in the state of karnataka on ham under bmp
Construction of strr(west side)nh948a obalapura (nelamangala taluk))to somakkanamutta(magadi taluk) from km0.000 to km46.300(design)phase i pkg i in the state of karnataka on ham under bmp
Read moreConstruction of strr (west side) nh948a kunagal (ramanagara taluk) to thattekere (kanakapura taluk) from km 79.000 to km 112.600 (design) with length of 33.6km in the state of karnataka on ham under bharatmala pariyojana (pkg-1)
Construction of strr (west side) nh948a kunagal (ramanagara taluk) to thattekere (kanakapura taluk) from km 79.000 to km 112.600 (design) with length of 33.6km in the state of karnataka on ham under bharatmala pariyojana (pkg-1)
Read moreIndependent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read moreConstruction of strr(west side) nh948a somakkanamutta(magadi taluk) to kunigal(ramanagara taluk) from km46.300 to km79.000(design chainage)phi pckgii in karnataka on ham under bmp.
Construction of strr(west side) nh948a somakkanamutta(magadi taluk) to kunigal(ramanagara taluk) from km46.300 to km79.000(design chainage)phi pckgii in karnataka on ham under bmp.
Read moreConstruction of strr (west side) nh948a bagganadoddi (anekal taluk) to s. mudugadapalli (hosur taluk) from km 120.980 to km 144.420/144.170 (design) pkg3 in karnataka-tamil nadu on ham under bharatmala pariyojana (pkg-3)
Construction of strr (west side) nh948a bagganadoddi (anekal taluk) to s. mudugadapalli (hosur taluk) from km 120.980 to km 144.420/144.170 (design) pkg3 in karnataka-tamil nadu on ham under bharatmala pariyojana (pkg-3)
Read moreof your Industry type