Tender Details

Particulars Details
Title
Cs For Ie For Construction Of 4 L Thiruvananthapuram Orr Civil Pckg I And Ii From Navaikulam To Vizhinjam (0.450 To 62.200 L 62.65km In Kerala On Ham Mode Under Bmp In Kerala In Ham Mode Under Bmp.
Description
Cs For Ie For Construction Of 4 L Thiruvananthapuram Orr Civil Pckg I And Ii From Navaikulam To Vizhinjam (0.450 To 62.200 L 62.65km In Kerala On Ham Mode Under Bmp In Kerala In Ham Mode Under Bmp.
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_145824_1
Reference
Number
NHAI/13018 /KL/ IE/Navaikulam Vizhinjam/2023 Proc
Tender Fee 5000
EMD 0
Tender Value 0
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in

Start Date February 16, 2023 23:00
End Date
Expired 11/09/2023

Expired 1084 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 4l thiruvananthapuram orr-pckgii from thekkada to vizhinjam (ch-28.800 to ch-62.200 design length-33.40 km) in kerala on ham mode under bmp.

Construction of 4l thiruvananthapuram orr-pckgii from thekkada to vizhinjam (ch-28.800 to ch-62.200 design length-33.40 km) in kerala on ham mode under bmp.

Read more
Construction of 4l thiruvananthapuram orr-pckg-i from navaikulam to thekkada (ch- 0.450 to ch-28.800 design length-29.25 km) in kerala on ham mode under bmp.

Construction of 4l thiruvananthapuram orr-pckg-i from navaikulam to thekkada (ch- 0.450 to ch-28.800 design length-29.25 km) in kerala on ham mode under bmp.

Read more
Construction of 22 stps of 471.50 mld capacity in ham mode for ulbs between ghmc and orr

Construction of 22 stps of 471.50 mld capacity in ham mode for ulbs between ghmc and orr including mom for a period of 15 years under amrut-2.0 (tranche-iii)-package-ii

Read more
Ie services for development of 4lane economic corridor from kharagpur to chandrakona ghatal road crossing section km0.000 to km41.000 of nh16a in west bengal under bmp pckgi on ham.

Ie services for development of 4lane economic corridor from kharagpur to chandrakona ghatal road crossing section km0.000 to km41.000 of nh16a in west bengal under bmp pckgi on ham.

Read more
Construction work of 4-lane highway from km 0.000 to 42.040 bhopal (ratnaigiri tiraha) to vidisha (morikodi) of nh 146 under bmp in madhya pradesh on ham (ham) mode.

Construction work of 4-lane highway from km 0.000 to 42.040 bhopal (ratnaigiri tiraha) to vidisha (morikodi) of nh 146 under bmp in madhya pradesh on ham (ham) mode.

Read more
Cs for design of tunnels and cut and cover tunnels at the identified vulnerable locations in kerala for the construction of 4-lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.00) to vizhinjam (ch. 62.70) section of nh-866

Cs for design of tunnels and cut and cover tunnels at the identified vulnerable locations in kerala for the construction of 4-lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.00) to vizhinjam (ch. 62.70) section of nh-866

Read more
Upgrad to 4lane with paved shoulder config. of highway ing frm exist. km88.400(savali vihir)to km163.400(start of ahmednagar bypass)(length 75.000km)sec of nh160 in maharashtra under bmp on ham mode.

Upgrad to 4lane with paved shoulder config. of highway ing frm exist. km88.400(savali vihir)to km163.400(start of ahmednagar bypass)(length 75.000km)sec of nh160 in maharashtra under bmp on ham mode.

Read more
Independent engineer services for construction work of 4-lane highway from km 0.000 to km 42.040 bhopal (ratnaigiri tiraha) to vidisha (morikodi) section of nh-146 under bmp in madhya pradesh on ham mode.

Independent engineer services for construction work of 4-lane highway from km 0.000 to km 42.040 bhopal (ratnaigiri tiraha) to vidisha (morikodi) section of nh-146 under bmp in madhya pradesh on ham mode.

Read more
Construction of 6-lane access controlled gf highway from shiral village to chinchpur (b) village section of surat nashik ahmednagar solapur akkalkot on ham mode in the state of maharashtra under bmp. package-ix (km330.500-km370.000)length 39.50

Construction of 6-lane access controlled gf highway from shiral village to chinchpur (b) village section of surat nashik ahmednagar solapur akkalkot on ham mode in the state of maharashtra under bmp. package-ix (km330.500-km370.000)length 39.50

Read more
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for hirehalli fee plaza four laning of byrapura-challkere section of nh-150 on ham mode under bmp in the state of karnataka

Engagement of user fee collection agency on the basis of competitive bidding through e-tender for hirehalli fee plaza four laning of byrapura-challkere section of nh-150 on ham mode under bmp in the state of karnataka

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise