Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Iv Replacement Of The Existing Eroded Feeder Center Feed Pipe By Released Pipe In Mill 4 A To 4 D During Aoh 2025 26
|
| Description |
Mtps I Mill Plant Unit Iv Replacement Of The Existing Eroded Feeder Center Feed Pipe By Released Pipe In Mill 4 A To 4 D During Aoh 2025 26
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_589321_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.236/ 2025-26 |
| Tender Fee | 0 |
| EMD | 1100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=704013 |
| Start Date | August 05, 2025 22:30 |
| End Date |
Expired
11/08/2025
Expired 433 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator body in mill 4a, 4b and 4d
Ttps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator body in mill 4a, 4b and 4d
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Mtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant ac plant unit ii aoh 2026 27 air washer system epoxy painting of blowers and its auxiliaries fabrication of ms tank for cleaning of w type eliminators spray nozzles flushing works providing handrails in air washer circulating
Mtps i mill plant ac plant unit ii aoh 2026 27 air washer system epoxy painting of blowers and its auxiliaries fabrication of ms tank for cleaning of w type eliminators spray nozzles flushing works providing handrails in air washer circulating
Read moreof your Industry type