Rectification And Improvement Works Of Two S At Ch 0/000 And 0/587 Km And Cada Portion B/W Ch 0/587 To 0/770km Of Tail End Of Pothampadam
|
Description |
Gps I Modernization Of&Amp#X0d
Field Channel 2024 25 Rectification&Amp#X0d
And Improvement Works To Two Drops At Ch&Amp#X0d
0/000 And Ch 0/587 Km And Cada Portion&Amp#X0d
Between Ch 0/587 0/770 Km Of Tail End&Amp#X0d
Field Channel Of Pothampadam Branch Canal
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_753194_1 |
Reference Number |
IRR/PI/TR/4209/2022_5_6_5/1 |
Tender Fee | 1740 |
EMD | 19707 |
Tender Value | |
Place | chittur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1222223 |
Start Date | March 20, 2025 22:30 |
End Date |
27/03/2025 ( Expired 47 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read moreJp/b653-000-pk-t-3001/1007 mechanical works for revamping of sv stations, gas terminal and kribcho terminal (part-b) at ongc hazira plant
Mechanical works for revamping of sv stations, gas terminal and kribcho terminal (part-b) at ongc hazira plant
Read moreSpecial repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10
Special repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10
Read moreRepair replacement to joinery works including partitions, false ceiling, acp works and other connected works in the buildings of area b at naval dockyard visakhapatnam under ge(i) dm visakhapatnam
Repair replacement to joinery works including partitions, false ceiling, acp works and other connected works in the buildings of area b at naval dockyard visakhapatnam under ge(i) dm visakhapatnam
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk cost of contractor)
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk cost of contractor)
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read more8694 repair replacement and cleaning of manholes sewage line septic tank soakage well and connected misc b r works at aicts ngm ogm fafa pcda o and nadfm area under age b r i of ge s pune
8694 repair replacement and cleaning of manholes sewage line septic tank soakage well and connected misc b r works at aicts ngm ogm fafa pcda o and nadfm area under age b r i of ge s pune
Read moreSpl repair to acc sheet roofing ceiling and allied works of otm bldgs of certain areas complex at mamun under ge s mamun
Spl repair to acc sheet roofing ceiling and allied works of otm bldgs of certain areas complex at mamun under ge s mamun
Read moreof your Industry type