Tender Details

Particulars Details
Title
For Dismantling And Re Erection Of 440 V O/H Line With O7 Nos Pole And 07 Span Conductor Providing Power To New Weigh Bridge And High Mast Tower At Godher Kwsk Siding Under Ngk Colliery
Description
For Dismantling And Re Erection Of 440 V O/H Line With O7 Nos Pole And 07 Span Conductor Providing Power To New Weigh Bridge And High Mast Tower At Godher Kwsk Siding Under Ngk Colliery
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_328031_1
Reference
Number
BCCL/AVI/EnM/2024-25/230
Tender Fee 0
EMD 1600
Tender Value
Place NGKC
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340010
Start Date February 06, 2025 16:30
End Date

19/02/2025 ( Expired 60 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area

Dismantling and erection of 440v oh line from 630kva transformer of feeder breaker to sampling office/ siding office and 630 kva transformer to drr-2 , mohan nagar pond and supplying power to road wb no-02 under dakra project, n.k area

Read more
Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area

Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area

Read more
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m

Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m

Read more
Replacement of 9 nos. of damaged tubular pole by 8 mtrs. pcc pole and erection of 2 new, 8 mtrs. pcc pole in 440v oh line of ara b-type colony along with erection of 21 nos. of fresh cradling and 9 nos. of new stay sets, in 440v oh line of ara colony

Replacement of 9 nos. of damaged tubular pole by 8 mtrs. pcc pole and erection of 2 new, 8 mtrs. pcc pole in 440v oh line of ara b-type colony along with erection of 21 nos. of fresh cradling and 9 nos. of new stay sets, in 440v oh line of ara colony

Read more
Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area

Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area

Read more
Work at electrical o/h line 6.6kv, sag conductor re-tenting. damaged conductor changing. dismantling and erection pipe poles and other work in kessurgarh weighbridge and ampl weigh bridge. siding area, abocp mine under block-ii area

Work at electrical o/h line 6.6kv, sag conductor re-tenting. damaged conductor changing. dismantling and erection pipe poles and other work in kessurgarh weighbridge and ampl weigh bridge. siding area, abocp mine under block-ii area

Read more
Supplying erection installation and commissioning of 16 mtr height, high mast tower including luminaries and feeder pillar box at chp siding of shyamsundarpur colliery under bankola area.

Supplying erection installation and commissioning of 16 mtr height, high mast tower including luminaries and feeder pillar box at chp siding of shyamsundarpur colliery under bankola area.

Read more
Various electrical activities like (a) ensuring power supply to various stalls (b) dismantling of faulty lights on the high mast and re-erection of new or repaired lights. (c) making arrangement for illumination circuit the crossed the ground etc

Various electrical activities like (a) ensuring power supply to various stalls (b) dismantling of faulty lights on the high mast and re-erection of new or repaired lights. (c) making arrangement for illumination circuit the crossed the ground etc

Read more
Extension of 220 v lt over head line for illumination from main substation to proposed working patch( parsodi) and also for providing power supply for new weigh bridge proposed to be constructed near this patch at amera ocp.

Extension of 220 v lt over head line for illumination from main substation to proposed working patch( parsodi) and also for providing power supply for new weigh bridge proposed to be constructed near this patch at amera ocp.

Read more
For dismantling and erection of damaged pole and re-strengthening of conductor of 550v overhead line at 6 no. water supply of kocp under hazaribagh area.

For dismantling and erection of damaged pole and re-strengthening of conductor of 550v overhead line at 6 no. water supply of kocp under hazaribagh area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise