Tender Details

Particulars Details
Title
Shifting Of Water Supply Pipelines To The Edge Of The Road Boundary In Connection With The Widening And Strengthening Of Mahabubnagar Nalgonda Road From Existing Double Lane To Four Lane From Km 156/2 To Km 163/2 In Nalgonda District
Description
Shifting Of Water Supply Pipelines To The Edge Of The Road Boundary In Connection With The Widening And Strengthening Of Mahabubnagar Nalgonda Road From Existing Double Lane To Four Lane From Km 156/2 To Km 163/2 In Nalgonda District
Organisation R&B - Telangana-SE R&B NALGONDA
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 6.52 Crore
Place Telangana
Link Login to view
Start Date October 16, 2026 01:30
End Date
Open 22/10/2026

7 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)

Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)

Read more
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane from km.264.00 to km.400.70 anchatageri to baleguli cross of nh 52 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane from km.264.00 to km.400.70 anchatageri to baleguli cross of nh 52 in the state of karnataka

Read more
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Read more
Work of utility shifting removing of electricity poles wire etc on the widening and strengthening work of bahraich-banda city road four laning from kalu kuan chauraha to mahokhar bypass length 4.00 km

Work of utility shifting removing of electricity poles wire etc on the widening and strengthening work of bahraich-banda city road four laning from kalu kuan chauraha to mahokhar bypass length 4.00 km

Read more
Widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode

Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode

Read more
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Read more
Widening and strengthening double lane to four lane on dindi - devarakonda road from km 34/0 to 38/4 (devarakonda town limits) in nalgonda district

Widening and strengthening double lane to four lane on dindi - devarakonda road from km 34/0 to 38/4 (devarakonda town limits) in nalgonda district

Read more
Widening and strengthening double lane to four lane on hyderabad - nagarjuna sagar road from km 78/4 to 80/4 (chintapally town portion) in nalgonda district

Widening and strengthening double lane to four lane on hyderabad - nagarjuna sagar road from km 78/4 to 80/4 (chintapally town portion) in nalgonda district

Read more
Widening and strengthening of narketpally - munugode road from km 4/8 to 8/8 (bhramanavellamla village portion) from double lane to four lane in nalgonda district

Widening and strengthening of narketpally - munugode road from km 4/8 to 8/8 (bhramanavellamla village portion) from double lane to four lane in nalgonda district

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise