Tender Details

Particulars Details
Title
Shifting Of Water Supply Pipelines To The Edge Of The Road Boundary In Connection With The Widening And Strengthening Of Mahabubnagar Nalgonda Road From Existing Double Lane To Four Lane From Km 156/2 To Km 163/2 In Nalgonda District
Description
Shifting Of Water Supply Pipelines To The Edge Of The Road Boundary In Connection With The Widening And Strengthening Of Mahabubnagar Nalgonda Road From Existing Double Lane To Four Lane From Km 156/2 To Km 163/2 In Nalgonda District
Organisation Telangana
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 15, 2026 21:57
End Date
Open 22/10/2026

5 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Shifting of water supply pipelines to the edge of the road boundary in connection with the widening and strengthening of mahabubnagar nalgonda road from existing double lane to four lane from km 156/2 to km 163/2 in nalgonda district

Shifting of water supply pipelines to the edge of the road boundary in connection with the widening and strengthening of mahabubnagar nalgonda road from existing double lane to four lane from km 156/2 to km 163/2 in nalgonda district

Read more
Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)

Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)

Read more
Widening and strengthening work of four-lane road (mahoba-charkhari-muskara major district road) from jhalkari bai tiraha via kirat sagar to bajariya chowki

Widening and strengthening work of four-lane road (mahoba-charkhari-muskara major district road) from jhalkari bai tiraha via kirat sagar to bajariya chowki

Read more
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane from km.264.00 to km.400.70 anchatageri to baleguli cross of nh 52 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane from km.264.00 to km.400.70 anchatageri to baleguli cross of nh 52 in the state of karnataka

Read more
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka

Read more
Work of utility shifting removing of electricity poles wire etc on the widening and strengthening work of bahraich-banda city road four laning from kalu kuan chauraha to mahokhar bypass length 4.00 km

Work of utility shifting removing of electricity poles wire etc on the widening and strengthening work of bahraich-banda city road four laning from kalu kuan chauraha to mahokhar bypass length 4.00 km

Read more
Rfp for the balance work for widening to four lane of bhadohi to varanasi section of nh 731b from design km 49.200 to km 89.285 on percentage rate basis in the state of uttar pradesh.

Rfp for the balance work for widening to four lane of bhadohi to varanasi section of nh 731b from design km 49.200 to km 89.285 on percentage rate basis in the state of uttar pradesh.

Read more
Widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode

Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode

Read more
I)improvements to pwd road to bomraspet road from km 0/0 to 2/0 from 2 lane to 4 lane in vikarabad district.ii) widening strengthening of single lane to double lane of vikarabad to dharur railway station road from km 0/0 to 22/0 in vikarabad district and iii) improvements to gadisingapur - rangareddypally road from km 0/0 to 26/0 ( renewal from km 0/0 to 10/0 sl to dl from km 10/0 to 26/0) in vikarabad , mahabubnagar district.sub work: consultancy services for preparation of dpr for the rob

I)improvements to pwd road to bomraspet road from km 0/0 to 2/0 from 2 lane to 4 lane in vikarabad district.ii) widening strengthening of single lane to double lane of vikarabad to dharur railway station road from km 0/0 to 22/0 in vikarabad district and iii) improvements to gadisingapur - rangareddypally road from km 0/0 to 26/0 ( renewal from km 0/0 to 10/0 sl to dl from km 10/0 to 26/0) in vikarabad , mahabubnagar district.sub work: consultancy services for preparation of dpr for the rob at km 7/2-4 on vikarabad dharur railway station road.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise