Supply And Fixing Of 03 (Three) Range Of 200 Mtr. (200 X 3) Length 4 Inch Dia Hdpe Pipeline In Lower Sump For De Watering And Fire Fighting At Tetariakhar Ocp Under Rajhara Area.
|
Description |
Supply And Fixing Of 03 (Three) Range Of 200 Mtr. (200 X 3) Length 4 Inch Dia Hdpe Pipeline In Lower Sump For De Watering And Fire Fighting At Tetariakhar Ocp Under Rajhara Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_302615_1 |
Reference Number |
PE(EnM)/TTK/NIT/2023-24/14 dtd 24.02.20244 |
Tender Fee | 0 |
EMD | 5538 |
Tender Value | |
Place | Tetariakhar OCP Rajhara Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=313481 |
Start Date | February 24, 2024 22:30 |
End Date |
04/03/2024 ( Expired 438 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreProviding ,laying and fixing of gi pipe for fire fighting work around coal stock at tetariakhar ocp under rajhara area
Providing ,laying and fixing of gi pipe for fire fighting work around coal stock at tetariakhar ocp under rajhara area
Read moreTransportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreFabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Fabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Read moreLaying of pipeline of 6 inch diameter and 200 m of length for fire fighting at coal heap no. 06 of gidi- c colony.
Laying of pipeline of 6 inch diameter and 200 m of length for fire fighting at coal heap no. 06 of gidi- c colony.
Read moreFor layout of 6inch 8 inch and 10inch ms pipeline approx 200 mtr length for 2000 gpm pump at pahari patch of tetulmari colliery under sijua area
For layout of 6inch 8 inch and 10inch ms pipeline approx 200 mtr length for 2000 gpm pump at pahari patch of tetulmari colliery under sijua area
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreLaying and installation of pipeline 8 inch 200 dia size from surface to new sump at seam i of rampur batura ocp sohagpur area secl
Laying and installation of pipeline 8 inch 200 dia size from surface to new sump at seam i of rampur batura ocp sohagpur area secl