Tender Details

Particulars Details
Title
Construction Of Cc Road To Reach Wet Waste Process Unit In Ward 11, Farsouliana 02. Length 150 M, Width 5 M
Description
Construction Of Cc Road To Reach Wet Waste Process Unit In Ward 11, Farsouliana 02. Length 150 M, Width 5 M&Amp#X0d
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id 2025_DOLBU_1048688_1
Reference
Number
587-21/etender/15th dt. 13.06.25
Tender Fee 1500
EMD 1.22 Lakh
Tender Value -
Place RATH
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1929470

Start Date July 24, 2025 19:30
End Date
Expired 31/07/2025

Expired 443 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
3 tpd wet waste nirman karya

Nagar panchayat khargupur me 3tpd wet waste processing unit nirman karya.

Read more
Spl repair to road from rp gate to regt mandir (approx length 150 meter and width 5.50 meter) at ge nams

Spl repair to road from rp gate to regt mandir (approx length 150 meter and width 5.50 meter) at ge nams

Read more
03 tdp wet waste pit composite plant work

03 tdp wet waste pit composite plant work

Read more
Wet waste processing unit (5 tpd) ka nirman karya.

Wet waste processing unit (5 tpd) ka nirman karya.

Read more
Construction work for the wet waste processing unit 5 tonnes.

Construction work for the wet waste processing unit 5 tonnes.

Read more
Provision of high level pf high level (pf 02 & 03-length =580m & width= 10.5m) at tur and (pf- 02 length =505m & width =4m) at gwh.

Provision of high level pf high level (pf 02 & 03-length =580m & width= 10.5m) at tur and (pf- 02 length =505m & width =4m) at gwh.

Read more
[ratchet polyester slings of 6 meter length and 50 mm width ]

[ratchet polyester slings of 6 meter length and 50 mm width ]

Read more
Bty 12v 12ah length 15 cm width 9.5cm height 9 cm

Bty 12v 12ah length 15 cm width 9.5cm height 9 cm

Read more
Construction of mrf plant (dry waste prpcessing), wet/mixed waste composting plant, common facilities and insfrastructure

Construction of mrf plant (dry waste prpcessing), wet/mixed waste composting plant, common facilities and insfrastructure

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise