Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Water Tank With Submersible Pump Near Asir Sk House At Pirutola Under Uttar Lakshmipur Gp Tied,Ai 67597727
|
| Description |
Construction Of Water Tank With Submersible
Pump Near Asir Sk House At Pirutola Under Uttar
Lakshmipur Gp Tied,Ai 67597727
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_575225_1 |
|
Reference Number |
08(e)_1/ULPURGP/23 |
| Tender Fee | 0 |
| EMD | 4000 |
| Tender Value | |
| Place | GP OFFICE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 23, 2023 19:30 |
| End Date |
Expired
13/10/2023
Expired 985 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 200mm x 165mm dia x 225 mtrs deep hydtw with extra deep well hand pump platform installation of submersible motor pump and water supply arrangements with 4 x 1000 by 2 x 2000 ltrs hdpe water tank over platform pump handhydrent
Construction of 200mm x 165mm dia x 225 mtrs deep hydtw with extra deep well hand pump platform installation of submersible motor pump and water supply arrangements with 4 x 1000 by 2 x 2000 ltrs hdpe water tank over platform pump handhydrent
Read moreReplacement of pump- motor along with associated electrical panel at manaklao pump house
Replacement of pump- motor along with associated electrical panel at manaklao pump house
Read moreConstruction of solar water tank at majhi para at part no.- 62(sl. no -05)
Construction of solar water tank at majhi para at part no.- 62(sl. no -05)
Read moreMajor works water supply scheme south tripura district replacement of 1 dtw sh construction of pump house pipeline laying for reconnection from new spot to existing pipeline and allied works at ongc gajalia nabagram gp satchand rd block 2026 27
Major works water supply scheme south tripura district replacement of 1 dtw sh construction of pump house pipeline laying for reconnection from new spot to existing pipeline and allied works at ongc gajalia nabagram gp satchand rd block 2026 27
Read moreComplete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Read moreProvn of direct pumping line from 32 jcos pump house to p-71 and p-27 jcos accn and connected works at asc centre (sounth) pump house under ge (central) bengalore
Provn of direct pumping line from 32 jcos pump house to p-71 and p-27 jcos accn and connected works at asc centre (sounth) pump house under ge (central) bengalore
Read moreSupply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Read moreRepair/maint of water main pipeline, sluice valves, arvs, valve pits, nrvs and dosing systems at various distributions pump houses with allied works under ge (utilities) udhampur
Repair/maint of water main pipeline, sluice valves, arvs, valve pits, nrvs and dosing systems at various distributions pump houses with allied works under ge (utilities) udhampur
Read more8306 cleaning of oh/ug sump, service tank including replacement of water tanks and connected work at naval dockyard under ge kunjali
8306 cleaning of oh/ug sump, service tank including replacement of water tanks and connected work at naval dockyard under ge kunjali
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type