Tender Details
Particulars | Details |
---|---|
Title |
Cs For Preparation Of Dpr For Tech Assessment And Improvement Measures On Existing 6 Lane Udaipur Ratanpur Shamlaji Section Km 287.400 To Km 401.200 Of Nh8 And And Preparation Of Dpr For Con Of New Udaipur Bypass In Rajasthan And Gujarat
|
Description |
Cs For Preparation Of Dpr For Tech Assessment And Improvement Measures On Existing 6 Lane Udaipur Ratanpur Shamlaji Section Km 287.400 To Km 401.200 Of Nh8 And And Preparation Of Dpr For Con Of New Udaipur Bypass In Rajasthan And Gujarat
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | April 29, 2025 18:30 |
End Date |
12/06/2025 ( 23 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreConsultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreCs for feasibility study and dpr for 2l ps for nh 516e from km 8.830 to 10.400 km 12.800 to 14.400 and km 23.200 to 43.700 of rajamahendravaram to rampachodavaram and for nh-26 from km 473.287 to 486.831 of raipur visakhapatnam section in ap
Cs for feasibility study and dpr for 2l ps for nh 516e from km 8.830 to 10.400 km 12.800 to 14.400 and km 23.200 to 43.700 of rajamahendravaram to rampachodavaram and for nh-26 from km 473.287 to 486.831 of raipur visakhapatnam section in ap
Read moreConsultancy services for preparation of dpr and land acquisition of tamsa city bypass road on nh 752i km 0.00 to km 3.00 in taluka hadgaon district nanded in the state of maharashtra on epc mode length 3.00 km
Consultancy services for preparation of dpr and land acquisition of tamsa city bypass road on nh 752i km 0.00 to km 3.00 in taluka hadgaon district nanded in the state of maharashtra on epc mode length 3.00 km
Read moreConstruction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Read moreof your Industry type