Tender Details
About Tender
🚂 Procurement Opportunity: Labyrinth Sealing Ring (D End) 🛠️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Supply Of Labyrinth Sealing Ring (D End). 🏗️ 📅 Bid Submission Deadline: June 19, 2024, 3:00 Pm A Tender Fee Of Inr 2,00,000/ Is Applicable For Participation. Interested Suppliers Must Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Tender Document For Complete Deion. Keywords: Labyrinth Sealing Ring, D End, Ministry Of Railways, Central Government, Tender, Procurement, Railway SuppliesParticulars | Details |
---|---|
Title |
Kit For Check Valve With Strainer 1/2 As Per Ftrtipl Pt.No: 790009105 Consisting Of Following 5 Items
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106301516 |
Reference Number |
02241012 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106587462/viewNitPdf_4844625.pdf |
Start Date | January 24, 2025 16:14 |
End Date |
18/02/2025 ( Expired 62 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Read moreFencing with r.c.c. pole of length 2 m provide 2m c/c. the rate for barbed wire and rcc pole with fixing should be quoted seperately as per drawing.
Fencing with r.c.c. pole of length 2 m provide 2m c/c. the rate for barbed wire and rcc pole with fixing should be quoted seperately as per drawing.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreSupply of handpump related material and items as per list for financial year 2025-26
Supply of handpump related material and items as per list for financial year 2025-26
Read moreProcurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia
Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia
Read moreAwarding contract for deployment of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.
Awarding contract for deployment of 28 nos. of 7.5 kva mobile lighting generators with light fitting and bulbs for illumination as per dgms standards on hire basis at pkoc, manugurur area for a period of 2 years - reg.
Read moreCalibration of keysight/agilent/hp instrument ( as per annexure-2) (1 job),calibration of keysight/
Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreSupply of handpump related material and items as per list for financial year 2025-26
Supply of handpump related material and items as per list for financial year 2025-26
Read moreof your Industry type