Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Works Of Soil Lab At Thuravur In Alapuzha
|
| Description |
Repair Works Of Soil Lab Alapuzha
|
| Organisation | Government of Kerala |
| Tender Id | 2023_VFPCK_629393_1 |
|
Reference Number |
VFPCK/ENGG/SOILLAB/ALPY |
| Tender Fee | 500 |
| EMD | 2200 |
| Tender Value | - |
| Place | VFPCK HQ |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | December 07, 2023 23:00 |
| End Date |
Expired
16/12/2023
Expired 1030 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of pharmaceutical chemicals and lab equipment
Supply of pharmaceutical chemicals and lab equipment
Read moreSupply and installation of laboratory instruments/equipments for mechanical engineering lab
Supply and installation of laboratory instruments/equipments for mechanical engineering lab
Read moreSupply and installation of laboratory instruments/equipments for electrical engineering lab
Supply and installation of laboratory instruments/equipments for electrical engineering lab
Read moreSupply and installation of laboratory instruments/equipments for electronics engineering lab
Supply and installation of laboratory instruments/equipments for electronics engineering lab
Read moreSupply of machines and equipments for textile engineering lab at govt. polytechnic, bhagalpur
Supply of machines and equipments for textile engineering lab at govt. polytechnic, bhagalpur
Read moreSupply and installation of laboratory instruments/equipments for computer science and engineering lab.
Supply and installation of laboratory instruments/equipments for computer science and engineering lab.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreComprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreSupply of drugs, lab chemicals and consumables to taluk general hospital tarikere, chikkamagaluru dist for the year 2026-27
Supply of drugs, lab chemicals and consumables to taluk general hospital tarikere, chikkamagaluru dist for the year 2026-27
Read moreof your Industry type