Tender Details

Particulars Details
Title
Repair Works Of Soil Lab At Thuravur In Alapuzha
Description
Repair Works Of Soil Lab Alapuzha
Organisation Government of Kerala
Tender Id 2023_VFPCK_629393_1
Reference
Number
VFPCK/ENGG/SOILLAB/ALPY
Tender Fee 500
EMD 2200
Tender Value -
Place VFPCK HQ
Link
View Original Tender Notice

https://etenders.kerala.gov.in

Start Date December 07, 2023 23:00
End Date
Expired 16/12/2023

Expired 1030 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of pharmaceutical chemicals and lab equipment

Supply of pharmaceutical chemicals and lab equipment

Read more
Supply and installation of laboratory instruments/equipments for mechanical engineering lab

Supply and installation of laboratory instruments/equipments for mechanical engineering lab

Read more
Supply and installation of laboratory instruments/equipments for electrical engineering lab

Supply and installation of laboratory instruments/equipments for electrical engineering lab

Read more
Supply and installation of laboratory instruments/equipments for electronics engineering lab

Supply and installation of laboratory instruments/equipments for electronics engineering lab

Read more
Supply of machines and equipments for textile engineering lab at govt. polytechnic, bhagalpur

Supply of machines and equipments for textile engineering lab at govt. polytechnic, bhagalpur

Read more
Supply and installation of laboratory instruments/equipments for computer science and engineering lab.

Supply and installation of laboratory instruments/equipments for computer science and engineering lab.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Supply of drugs, lab chemicals and consumables to taluk general hospital tarikere, chikkamagaluru dist for the year 2026-27

Supply of drugs, lab chemicals and consumables to taluk general hospital tarikere, chikkamagaluru dist for the year 2026-27

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise