Tender Details
Particulars | Details |
---|---|
Title |
Acebrophylline 100 Mg Acetylcysteine 600 Mg
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106584952 |
Reference Number |
82241366A |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Jabalpur |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/032025/106584952/viewNitPdf_4841668.pdf |
Start Date | January 22, 2025 01:01 |
End Date |
04/03/2025 ( Expired 97 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreConsultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh
 stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Read moreInj amikacin 500 mg,inj botulinum toxin type a 100 units,inj cefoperazone sulbactam,inj ceftriaxone
Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreShort notice inviting tender for supplying zinc tablets 20 mg
Short notice inviting tender for supplying zinc tablets 20 mg
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreConstruction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex
Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex
Read moreof your Industry type