Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Testing Of 04 Nos Lincon Power Master System Air Operated Lubrication Pump Of Pand H Shovels At Kakri Project.
|
Description |
Repairing And Testing Of 04 Nos Lincon Power Master System Air Operated Lubrication Pump Of Pand H Shovels At Kakri Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_312082_1 |
Reference Number |
KKR/SO(Excv)/E-22/24-25/137 |
Tender Fee | 0 |
EMD | 3900 |
Tender Value | |
Place | NCL Kakri Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323435 |
Start Date | July 09, 2024 15:00 |
End Date |
19/07/2024 ( Expired 325 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, manufacture, supply, erection and testing at factory and site of seismically qualified electrically operated overhead cranes in rup, frfcf, kalpakkam
Design, manufacture, supply, erection and testing at factory and site of seismically qualified electrically operated overhead cranes in rup, frfcf, kalpakkam
Read moreProviding, erection testing and fixing of online continuous monitoring system as per ngt and ppcb guide lines at sewerage treatment plant.
Providing, erection testing and fixing of online continuous monitoring system as per ngt and ppcb guide lines at sewerage treatment plant.
Read moreOverhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisory equipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra stepsvibration monitorin
Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisoryequipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra steps vibration monitori
Read moreProcurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.
Procurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.
Read moreRepair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Read moreSupply, fabrication, installation and testing of negative pressure system at wmp, frfcf
Supply, fabrication, installation and testing of negative pressure system at wmp, frfcf
Read moreSupply, installation, testing and commissioning of 01(one) no. tower type air conditioner at victoria memorial hall, kolkata
Supply, installation, testing and commissioning of 01(one) no. tower type air conditioner at victoria memorial hall, kolkata
Read moreRepair maint of pump motors of different capacity and accociated works alongwith testing of water samples at af stn singarsi under age i af singarsi
Repair maint of pump motors of different capacity and accociated works alongwith testing of water samples at af stn singarsi under age i af singarsi
Read moreRepair maintenance of pump set borewell dosing system development depthing of borewell and other connected items at itarana cantt under ge alwar
Repair maintenance of pump set borewell dosing system development depthing of borewell and other connected items at itarana cantt under ge alwar
Read moreRepair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure, earthings at lake line, heig line and pump house area and repair replacement an maintenance of ht switch gears, ht distribution system, 2 4 pole struc
Repair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure, earthings at lake line, heig line and pump house area and repair replacement an maintenance of ht switch gears, ht distribution system, 2 4 pole struc
Read moreof your Industry type