Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening Work Of Two Lanes With Paved Shoulders In Km 1 To 6 (500) Of Gulaothi Abadi Part (Old National Highway) From Nh 334 In Bulandshahr District
|
| Description |
Widening Work Of Two Lanes With Paved Shoulders In Km 1 To 6 (500) Of Gulaothi Abadi Part (Old National Highway) From Nh 334 In Bulandshahr District
|
| Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
| Tender Id | 2024_CEMRT_908800_1 |
|
Reference Number |
1662 /96M (II)/E-TENDER/BSR CIRCLE/2023-24 Dated 12.02.2024 |
| Tender Fee | 2714 |
| EMD | 24 Lakh |
| Tender Value | - |
| Place | BULANDSHAHAR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1567818 |
| Start Date | March 01, 2024 17:30 |
| End Date |
Expired
06/03/2024
Expired 956 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreEngagement of user fee agency on the basis of cb through e-tender at nagampatti fp at km 196.650 of two lanes with paved shoulders tindivanam to krishnagiri section of nh-66 from km 37.600 to km 219.782 in tamil nadu
Engagement of user fee agency on the basis of cb through e-tender at nagampatti fp at km 196.650 of two lanes with paved shoulders tindivanam to krishnagiri section of nh-66 from km 37.600 to km 219.782 in tamil nadu
Read moreWidening and strengthening work of the road from modaha chauraha to mau shiwala (other district road) in ayodhya district to a two-lane configuration with paved shoulders.
Widening and strengthening work of the road from modaha chauraha to mau shiwala (other district road) in ayodhya district to a two-lane configuration with paved shoulders.
Read moreWidening and strengthening of bhatni-bhingari road with paved shoulders odr from chainage 0-000 to 15-000 under the inter-state connectivity scheme in dist deoria
Widening and strengthening of bhatni-bhingari road with paved shoulders odr from chainage 0-000 to 15-000 under the inter-state connectivity scheme in dist deoria
Read moreWidening works, development of paved shoulders, junction improvement and development of bus bays for long term rectification of blackspot no. 195 (umariya school) on badwah-dhamnod road under indore division
Widening works, development of paved shoulders, junction improvement and development of bus bays for long term rectification of blackspot no. 195 (umariya school) on badwah-dhamnod road under indore division
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreHard shoulders and interlocking tiles work including widening of structures and drains from kupra village to banswara of nh-927a km 257/00 to 261/00
Hard shoulders and interlocking tiles work including widening of structures and drains from kupra village to banswara of nh-927a km 257/00 to 261/00
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreof your Industry type