Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Deposit Wss To Kondotty Interconnection Work From Existing Line And Newly Laid 160 Mm Hdpe Along Nh966 Thalekkara To Pothuvettippara And Commissioning Of Existing Distribution System And Road Restoration Work In Lsgd Roads In Kondotty
|
| Description |
Deposit Wss To Kondotty Interconnection Work From Existing Line And Newly Laid 160 Mm Hdpe Along Nh966 Thalekkara To Pothuvettippara And Commissioning Of Existing Distribution System And Road Restoration Work In Lsgd Roads In Kondotty
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2025_KWA_766682_1 |
|
Reference Number |
EE/PROJ/MPM/01/2025-26 |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | - |
| Place | kondotty muncipality |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1249862 |
| Start Date | May 28, 2025 20:30 |
| End Date |
Expired
09/06/2025
Expired 455 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Interconnection of newly laid hdpe pipe with existing main under chandernagore municipal corporation
Interconnection of newly laid hdpe pipe with existing main under chandernagore municipal corporation
Read moreInterconnection of existing laid pipes at ambica colony hari vihar and langer in kunjwani under ut capex.
Interconnection of existing laid pipes at ambica colony hari vihar and langer in kunjwani under ut capex.
Read morePhase-i interconnection of distribution network to newly laid di pipeline from shirvoi mbr to nanu farm-sulcorna in sanguem constituency.
Phase-i interconnection of distribution network to newly laid di pipeline from shirvoi mbr to nanu farm-sulcorna in sanguem constituency.
Read moreThodiyoor-shifting of house connections and interconnection to the newly laid 180mm/110 mm hdpe pipe in driver jn - kallukadav krfb road
Thodiyoor-shifting of house connections and&#x0d interconnection to the newly laid 180mm/110&#x0d mm hdpe pipe in driver jn - kallukadav&#x0d krfb road
Read moreMaintenance of wss of st. andre constituency - tapping from new 2000m3 glr to old pumphouse (2nos) and interconnection of existing 300mm di pumping main pipeline to newly laid 250mm di pipeline at bambolim pump house.
Maintenance of wss of st. andre constituency - tapping from new 2000m3 glr to old pumphouse (2nos) and interconnection of existing 300mm di pumping main pipeline to newly laid 250mm di pipeline at bambolim pump house.
Read moreJal jeevan mission (jjm)-rwss to sooranad south-shifting of existing service connections to the newly laid distribution line of 160 mm pvc at kumaramchira junction to kumaramchira ups in sooranad south grama panchayath.-general civil work
Jal jeevan mission (jjm)-rwss to sooranad south-shifting of existing service connections to the newly laid distribution line of 160 mm pvc at kumaramchira junction to kumaramchira ups in sooranad south grama panchayath.-general civil work
Read moreUnder the uidssmt scheme, all materials, connections, fittings and testing for connecting pipes from newly laid or existing water pipes for kedgaon suburban area
Under the uidssmt scheme, all materials, connections, fittings and testing for connecting pipes from newly laid or existing water pipes for kedgaon suburban area
Read moreUnder the uidssmt scheme, all materials, connections, fittings and testing for connecting pipes from newly laid or existing water pipes for kedgaon suburban area
Under the uidssmt scheme, all materials, connections, fittings and testing for connecting pipes from newly laid or existing water pipes for kedgaon suburban area
Read moreJal jeevan mission jjm 2020 21 phase ii balance work interconnection work of newly laid 300 mm dia di pipe with 500 mm dia di pumping main along mulakkulam vettikkattumukku road at manakkakadavu velloor pipeline work
Jal jeevan mission jjm 2020 21 phase ii balance work interconnection work of newly laid 300 mm dia di pipe with 500 mm dia di pumping main along mulakkulam vettikkattumukku road at manakkakadavu velloor pipeline work
Read moreJal jeevan mission jjm 2020 21 phase ii balance work interconnection work of newly laid 300 mm dia di pipe with 500 mm dia di pumping main along mulakkulam vettikkattumukku road at manakkakadavu velloor pipeline work
Jal jeevan mission jjm 2020 21 phase ii balance work interconnection work of newly laid 300 mm dia di pipe with 500 mm dia di pumping main along mulakkulam vettikkattumukku road at manakkakadavu velloor pipeline work
Read moreof your Industry type