Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Borewell With One Number 35 Hp Submersible Pump And 150 Kl Underground Sump Well For Ntcda At Btc Itbp Bhanu
|
Description |
Construction Of Borewell With One Number 35 Hp Submersible Pump And 150 Kl Underground Sump Well For Ntcda At Btc Itbp Bhanu
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.02 Lakh |
Tender Value | |
Place | ITBP BTC BHANU |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 23:00 |
End Date |
19/06/2025 ( 17 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read moreSupply, manning, operation and maintenance of one(01) number security launch with steel/frp/aluminium hull on hire basis having speed of 20knots for a period ten of years
Supply, manning, operation and maintenance of one(01) number security launch with steel/frp/aluminium hull on hire basis having speed of 20knots for a period ten of years
Read moreSupply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam
Supply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreConstruction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.
Construction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.&#x0d &#x0d
Read moreProvn of chain link fence with in and out gate for ksp provn of interlocking pathway in the unit location provn of area drainage at certain unit provn of sewage line and soak well for or cook house and or bathing point at certain unit provn of chain
Provn of chain link fence with in and out gate for ksp provn of interlocking pathway in the unit location provn of area drainage at certain unit provn of sewage line and soak well for or cook house and or bathing point at certain unit provn of chain
Read moreConstruction of open shed for fodder machinery and equipment area along with shed for tmr preparation and dispatch of feed section and dismantle of existing silo pit and thrasher area at fodder field at bull mother farm , kalyani, nadia -741235
Construction of open shed for fodder machinery and equipment area along with shed for tmr preparation and dispatch of feed section and dismantle of existing silo pit and thrasher area at fodder field at bull mother farm , kalyani, nadia -741235
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreProviding project management consultancy for construction of new air conditioned engine assembly shop with annex building for offices and sub-station at engine factory avadi
Providing project management consultancy for construction of new air conditioned engine assembly shop with annex building for offices and sub-station at engine factory avadi
Read moreConstruction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Construction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Read moreof your Industry type