Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Borewell With One Number 35 Hp Submersible Pump And 150 Kl Underground Sump Well For Ntcda At Btc Itbp Bhanu
|
Description |
Construction Of Borewell With One Number 35 Hp Submersible Pump And 150 Kl
Underground Sump Well For Ntcda At Btc Itbp Bhanu
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.02 Lakh |
Tender Value | |
Place | ITBP BTC BHANU |
Link |
AAAAAAAAAA Login to view |
Start Date | April 21, 2025 18:00 |
End Date |
12/05/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Read moreConstruction of borewell with one number 35 hp submersible pump and 150 kl underground sump well for ntcda at btc itbp bhanu
Construction of borewell with one number 35 hp submersible pump and 150 kl
 underground sump well for ntcda at btc itbp bhanu
Read moreIn ward number 27 mathurapur, agreement with martyrdom from mubarak to latif, kallu to ram narayan and link, pipe in the neck and reason for construction of cc road. stop.
In ward number 27 mathurapur, agreement with martyrdom from mubarak to latif, kallu to ram narayan and link, pipe in the neck and reason for construction of cc road. stop.
Read moreConstn of one addn room for supw robotics lab ug water storage tank and widening of the road at the backside of the school bldg with provn of pavers blocks for car parking and resurface of the road in front of the school bldg at kv ganeshkhind pune
Constn of one addn room for supw robotics lab ug water storage tank and widening of the road at the backside of the school bldg with provn of pavers blocks for car parking and resurface of the road in front of the school bldg at kv ganeshkhind pune
Read moreSinking of (300x200x150) mtr and 150x150x150 mtr deapth tw ,construction of pump house and construction of toilet block at ph-ii,boundrary wall repairing ,laying distribution system and interconnection of pwss with detials route sourvey
Sinking of (300x200x150) mtr and 150x150x150 mtr deapth tw ,construction of pump house and construction of toilet block at ph-ii,boundrary wall repairing ,laying distribution system and interconnection of pwss with detials route sourvey
Read moreDrilling of one number of borewell and providing and fixing submersible motor with accessories within cantonment board kasauli
Drilling of one number of borewell and providing and fixing submersible motor with accessories within cantonment board kasauli
Read moreDesign, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Read moreConstruction of 33 kv sub station at dholiya baba and aakhalinadi with 33 kv line 1 km for dholiya baba and aakhalinadi with 11 kv interconnection 17 km for dholiya baba and aakhalinadi under sub division bap under phalodi circle
Construction of 33 kv sub station at dholiya baba and aakhalinadi with 33 kv line 1 km for dholiya baba and aakhalinadi with 11 kv interconnection 17 km for dholiya baba and aakhalinadi under sub division bap under phalodi circle
Read moreConstruction of 15 mtr wide four face artificial rock climbing wall with slithering at 24 bn itbp sub head construction of foundation steel frame and overhead shed at 24 bn itbp leh
Construction of 15 mtr wide four face artificial rock climbing wall with slithering at 24 bn itbp sub head construction of foundation steel frame and overhead shed at 24 bn itbp leh
Read moreof your Industry type