Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction And Commissioning Of Tube Well By All Type Of Rig With 2 Year Defect Liability Period Under Tehsil Nokhada And Sindhary
|
| Description |
Construction And Commissioning Of Tube Well By All Type Of Rig With 2 Year Defect Liability Period Under Tehsil Nokhada And Sindhary
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_PHCJO_358204_1 |
|
Reference Number |
2023-24/NIT41 |
| Tender Fee | 2500 |
| EMD | 2.4 Lakh |
| Tender Value | - |
| Place | EE PHED SOUTH DIV BARMER |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | August 14, 2023 15:00 |
| End Date |
Expired
21/08/2023
Expired 1148 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of new lift (1 no) of 13 passenger capacity with g+5 stops and comprehensive annual maintenance for 5 years after defect liability period at maitrivihar commercial complex
Supply and installation of new lift (1 no) of 13 passenger capacity with g+5 stops and comprehensive annual maintenance for 5 years after defect liability period at maitrivihar commercial complex
Read moreWork descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Work descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Read moreConstruction of high yield tube well at harnaha tola in ward no. 63
Construction of high yield tube well at harnaha tola in ward no. 63
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreConstruction of high yield tube well at arya kumar road machua toli in ward no. 42
Construction of high yield tube well at arya kumar road machua toli in ward no. 42
Read moreConstruction of high yield tube well at near samudayik bhawan khazpura gaon in ward no. 04
Construction of high yield tube well at near samudayik bhawan khazpura gaon in ward no. 04
Read moreConstruction of high yield tube well at kila road in revenue clerk office campus in ward no. 67
Construction of high yield tube well at kila road in revenue clerk office campus in ward no. 67
Read moreDrilling of bore well at bhagath singmarg graveyard under rodamestri nagar ward-279 at chintal circle-54,qpz,cmc. (item no.4) (completion period 1 month)
Drilling of bore well at bhagath singmarg graveyard under rodamestri nagar ward-279 at chintal circle-54,qpz,cmc. (item no.4) (completion period 1 month)
Read moreDrilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Drilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Read moreDrilling of bore well at lenin nagar hindu graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.5) (completion period 1 month) (reserved for st)
Drilling of bore well at lenin nagar hindu graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.5) (completion period 1 month) (reserved for st)
Read moreof your Industry type