Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Fume Collector Hoods & Pipes And Relaying New Ones At Hard Chromium Plating & Phosphati
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2023/B/4213364 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | November 15, 2023 21:43 |
| End Date |
Expired
30/11/2023
Expired 1053 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | E.A.ASSOCIATES | Make : Model : Title : | 29-11-2023 22:09:03 | MSE | Evaluated |
| 2 | SASI ENTERPRISES | Make : Sasi Enterprises Model : Dismantling fume collector hoods and pipes Title : Dismantling fume collector hoods and pipes and relaying new ones at hard chromium plating and phosph | 29-11-2023 19:46:40 | MSE | Evaluated |
| 3 | V.P.ENGINEERING WORKS | Make : V P Engineering Works Model : Dismantling fume collector hoods & pipes Title : Dismantling fume collector hoods & pipes & relaying new at hard chromium plating & phosphatin | 30-11-2023 11:12:41 | MSE | Evaluated |
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreRegulex chromium plating salt to render hard chromium layer of 650 to 750 vpn hardness to be used i
Read more
Regulex chromium plating salt to render hard chromium layer of 650 to 750 vpn hardness to be used i
Read more
Internal machining, welding, hard chromium plating & red oxide primer coating of sr barrel assembly
Read more
Internal machining, welding, hard chromium plating & red oxide primer coating of sr barrel assembly
Read more
Internal machining, welding, hard chromium plating & red oxide primer coating of sr barrel assembly
Read more
Internal machining, welding, hard chromium plating & red oxide primer coating of sr barrel assembly
Read more
of your Industry type