Tender Details
Particulars | Details |
---|---|
Title |
Amc Of Ac Plants In Petro Cpp And Dh System In Lactam Plant 2023 2024
|
Description |
Amc Of Ac Plants In Petro Cpp And Dh System In Lactam Plant
2023 2024
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_FACT_769843_1 |
Reference Number |
5062/2023-2024/E28065 |
Tender Fee | 50 |
EMD | 12000 |
Tender Value | |
Place | PD Administrative building |
Link | https://eprocure.gov.in |
Start Date | September 02, 2023 22:30 |
End Date |
22/09/2023 ( Expired 628 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreRepair and water proofing of roof top dg station and paper store buildings at plant area, brbnmpl, mysuru
E-tenders are invited from eligible and qualified tenderers meeting qualification criteria for supply of the following goods and/or services/works. mstc event no.: brbnmpl/mysuru press/mmd/6/25-26/et/16
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreProviding, erection testing and fixing of online continuous monitoring system as per ngt and ppcb guide lines at sewerage treatment plant.
Providing, erection testing and fixing of online continuous monitoring system as per ngt and ppcb guide lines at sewerage treatment plant.
Read morePrive and breakdown shutdown maintenance of 220kv ,66kv cr panels, drs, ser, gps, grp, gcdp, digital avr , rtcc panels, protection system installed on 6.6kv,415v switchgear and other panels including meters, vfds, 6.6kv bus transfer system, f
Fire detection and alarm system, telephone exchanges and public address system installed in plant and power colony for 2x210mw stage-i and 2x250mw stage-ii ghtp, lehra mohabbat.
Read moreRenewal of corroded interconnecting channel segment and main beam patch-up beneath the nozzle floor of urea prill tower in urea plant during tar 2025
Renewal of corroded interconnecting channel segment and main beam patch-up beneath the nozzle floor of urea prill tower in urea plant during tar 2025
Read moreNotice inviting tender (nit) for design, engineering, manufacture, supply, erection, testing and commissioning of bath breaking and bath finishing machine in rodding shop-i for smelter plant (nalco), angul
Notice inviting tender (nit) for design, engineering, manufacture, supply, erection, testing and commissioning of bath breaking and bath finishing machine in rodding shop-i for smelter plant (nalco), angul
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreCleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Read moreof your Industry type