Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Hyd. Power Pack Of Electrical Winder Of Pit No. 3 Of Amritnagar Colliery.
|
| Description |
Repairing Of Hyd. Power Pack Of Electrical Winder Of Pit No. 3 Of Amritnagar Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_342951_1 |
|
Reference Number |
ECL/KNT/EnM/e-Ten/25-26/15 dt.28.08.2025 |
| Tender Fee | 0 |
| EMD | 8300 |
| Tender Value | - |
| Place | Amritnagar Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355500 |
| Start Date | September 02, 2025 22:30 |
| End Date |
Expired
12/09/2025
Expired 397 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of gear box pf electric winder at pit no.-01 of patmohana colliery under sodepur area.
Repairing of gear box pf electric winder at pit no.-01 of patmohana colliery under sodepur area.
Read moreMaking, machining and installation of crank shaft at no. 2 pit of central kajora colliery
Making, machining and installation of crank shaft at no. 2 pit of central kajora colliery
Read moreRepairing of the wornout arm eye connection bucket of be1000 hyd shovel sl.no. 10229/s452 of abdkg colliery, bastacolla area ix
Repairing of the wornout arm eye connection bucket of be1000 hyd shovel sl.no. 10229/s452 of abdkg colliery, bastacolla area ix
Read more1.drawing of 1 new 440 v overhead line (500 m) from no.2 pit substation to agent office, kumardhubi colliery, 2. new 550v overhead line (300 m) from no. 2 pit substation to no. 2 pit fan house at kumardhubi colliery, mugma area, ecl.3.a) drawing of n
1.drawing of 1 new 440 v overhead line (500 m) from no.2 pit substation to agent office, kumardhubi colliery, 2. new 550v overhead line (300 m) from no. 2 pit substation to no. 2 pit fan house at kumardhubi colliery, mugma area, ecl.3.a) drawing of n
Read moreSupply and fitting of boiler valves in breakdown and idle boiler of laskarbandh unit (6 pit) at madhaipur colliery
Supply and fitting of boiler valves in breakdown and idle boiler of laskarbandh unit (6 pit) at madhaipur colliery
Read moreRepairing of 150hp, 550v star delta starter 02 nos and 200amp 550v acb switch of 7 pit madhusudanpur colliery
Repairing of 150hp, 550v star delta starter 02 nos and 200amp 550v acb switch of 7 pit madhusudanpur colliery
Read moreErba glucose system pack,erba urea system pack,erba creatinine system pack,erba uric acid system pack,erba total bilirubin system pack,erba direct bilirubin system pack,erba sgpt system pack,erba sgot system pack,erba alp system pack,erba total proteins system pack,erba albusystem pack,erba cholesterol system pack,erba triglycerides system pack,erba hdl system pack,erba calcium system pack,erba magnesium system pack,erba phosphorus system pack,erba amylase system pack,erba lipase system pack,erba glycated heamoglobin system pack,erba microprotein system pack,erba cpk system pack,erba ldh system pack,pm kit for em 200,erba autowash pack,erba autowash 10 x 100 ml,erba multi calibrator 3x4 ml,biorad chemistry controls 1 and 2,erba h 360 3 part analyser diluent,erba h 360 3 part analyser lyse,erba h 360 3 part analyser cleaner,erba h360 3part analyser controls
Erba glucose system pack,erba urea system pack,erba creatinine system pack,erba uric acid system pack,erba total bilirubin system pack,erba direct bilirubin system pack,erba sgpt system pack,erba sgot system pack,erba alp system pack,erba total proteins system pack,erba albusystem pack,erba cholesterol system pack,erba triglycerides system pack,erba hdl system pack,erba calcium system pack,erba magnesium system pack,erba phosphorus system pack,erba amylase system pack,erba lipase system pack,erba glycated heamoglobin system pack,erba microprotein system pack,erba cpk system pack,erba ldh system pack,pm kit for em 200,erba autowash pack,erba autowash 10 x 100 ml,erba multi calibrator 3x4 ml,biorad chemistry controls 1 and 2,erba h 360 3 part analyser diluent,erba h 360 3 part analyser lyse,erba h 360 3 part analyser cleaner,erba h360 3part analyser controls
Read moreReplacement of motor and starter 02 sets at 13d and 18 x-cut at 6 pit of khas kajora colliery
Replacement of motor and starter 02 sets at 13d and 18 x-cut at 6 pit of khas kajora colliery
Read moreof your Industry type