Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Different Garbage Processing Unit Under Swachh Bharat Mission
|
Description |
Construction Of Different Garbage Processing Unit Under Swachh Bharat Mission
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_402308_1 |
Reference Number |
130-1 Dt 11-02-2025 |
Tender Fee | 10768 |
EMD | 49000 |
Tender Value | |
Place | KARRAPUR |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=473679 |
Start Date | February 13, 2025 16:00 |
End Date |
20/03/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreProcurement of different type fabric cloth for unit#7/dpps.
Procurement of different type fabric cloth for unit#7/dpps.
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreProcurement of civil works for new flood shelters at different locations of assam under assam integrated river bank management project
Procurement of civil works for new flood shelters at different locations of assam under assam integrated river bank management project
Read moreProcurement of civil works for retrofitting augmentation of existing schools at different locations of assam under assam integrated river basin management project
Procurement of civil works for retrofitting augmentation of existing schools at different locations of assam under assam integrated river basin management project
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.2
Different balance works related with six nos. pwss under khandaghosh block piplon guir punsur talun gopalbera ukhrid under durgapur sub-division of burdwan division, phe dte. district purba-bardhaman&#x0d &#x0d &#x0d &#x0d &#x0d
Read moreConstruction of type d (non mil) echs polyclinic bldg at koirengei, imphal under ge 869 ews leimakhong.
Construction of type d (non mil) echs 
 polyclinic bldg at koirengei, imphal under ge
 869 ews leimakhong.
Read moreof your Industry type