Tender Details

Particulars Details
Title
Connection Cable With Connectors, Length 3.0 M* 1000 V* Isolated Ident. No. 2350945
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2024/B/5003774
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date June 01, 2024 19:55
End Date
Expired 11/06/2024

Expired 857 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Advanced Weapons And Equipment India Limited

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 DMG MORI INDIA PRIVATE LIMITED Make : DMGMORI-Spare for DMGMORI Machine Model : IDENT. No. 2350945 Connection Cable with Connector Title : IDENT. No. 2350945 Connection Cable with Connectors, Length 3.0M* 1000V* Isolated 07-06-2024 16:34:16 N/A Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 DMG MORI INDIA PRIVATE LIMITED Item Categories : Connection Cable with Connectors, Length 3.0M* 1000V* Isolated IDENT. No. 2350945 108928.24 L1
Similar Tenders
Solid joint-32mm with extended length for 220mm ground connection in set

Solid joint-32mm with extended length for 220mm ground connection in set

Read more
Hose connection for 3/4 inch bore in the length of 1100mm and 4 nos

Hose connection for 3/4 inch bore in the length of 1100mm and 4 nos

Read more
Ohe modification work in connection with construction of 03 nos.full length stabling line towards dn grid at adityapur yd. in ckp division.

Ohe modification work in connection with construction of 03 nos.full length stabling line towards dn grid at adityapur yd. in ckp division.

Read more
S&t work in connection with - provision of full length pf shelter at ajmer station (nsg-2) on pf-6 of ajmer division nwr.

S&t work in connection with - provision of full length pf shelter at ajmer station (nsg-2) on pf-6 of ajmer division nwr.

Read more
Electrical trd portion work in in connection with extension of pit line by 290 meter to accommodate full length coaching rack at dd station of pune division.

Electrical trd portion work in in connection with extension of pit line by 290 meter to accommodate full length coaching rack at dd station of pune division.

Read more
Electrical work in connection with extension of ncc cnb sick line shed by 30m towards dli end alongwith one examination pit of one vande bharat coach length .electrical work in connection with upgradation of lighting arrangements and provision of pathway at gmc yard kanpur.

Electrical work in connection with extension of ncc cnb sick line shed by 30m towards dli end alongwith one examination pit of one vande bharat coach length .electrical work in connection with upgradation of lighting arrangements and provision of pathway at gmc yard kanpur.

Read more
Modification/alteration in existing ei and associated s&t work in connection due to extension of existing goods line (gt-2) to full length at shikohabad in prayagraj division.

Modification/alteration in existing ei and associated s&t work in connection due to extension of existing goods line (gt-2) to full length at shikohabad in prayagraj division.

Read more
Hose connection 1/2 bore ( 12. 5 mm bore) of 700 mm length (from underframe to bogie) drg no : emu/m - 3-5-079, item - 3,alt : s/ 2, type drg: icf.

Hose connection 1/2 bore ( 12. 5 mm bore) of 700 mm length (from underframe to bogie) drg no : emu/m - 3-5-079, item - 3,alt : s/ 2, type drg: icf.

Read more
Supply, erection,testing and commissioning of 25kv, ac ohe modification work in connection with provision of rail level additional full length goods handling line at taloja panchanand goods shed in mumbai division of central railway

Supply, erection,testing and commissioning of 25kv, ac ohe modification work in connection with provision of rail level additional full length goods handling line at taloja panchanand goods shed in mumbai division of central railway

Read more
Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station

Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise