Tender Details

Particulars Details
Title
Shifting Of Pipes In The Alignment Of Construction Of Bridge Near Gadigarh Sdm Office And Police Station Over Nallah Rohi At Gadigarh.
Description
Shifting Of Pipes In The Alignment Of Construction Of Bridge Near Gadigarh Sdm Office And Police Station Over Nallah Rohi At Gadigarh.
Organisation Government of Jammu and Kashmir
Tender Id 2023_PHE_226675_1
Reference
Number
ENIT NO PHEC/II/27 OF 2023-24
Tender Fee 500
EMD 7640
Tender Value
Place SHASTRI NAGAR JAMMU
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date August 19, 2023 00:00
End Date
Expired 24/08/2023

Expired 1047 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of new police barrack at gwalthai near hp police chowki

Construction of new police barrack at gwalthai near hp police chowki

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Deposit-strengthening of lwe affected police station - kelakam-supply and installation of lan at kelakam police station, kannur district-general electronics work

Deposit-strengthening of lwe affected police station - kelakam-supply and installation of lan at kelakam police station, kannur district-general electronics work

Read more
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).

Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).

Read more
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.

In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.

Read more
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu

Read more
Repair /maint of power supply/distribution system (atc sub-station, mafi i and ii sub-station, fms sub station, lca sub-station, dwr s/s, etb s/s and other certain locations in technical area

Repair /maint of power supply/distribution system &#x0d (atc sub-station, mafi i and ii sub-station, fms sub&#x0d station, lca sub-station, dwr s/s, etb s/s and other &#x0d certain locations in technical area at af stn sulur

Read more
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Read more
Hariparvat zone, ward no. 10 work involving the construction of a drain wall and culvert, and the installation of a mesh screen over the drain at nala budhan sayyad (near the shaikh basti railway track and the municipal corporation girls inter coll

Hariparvat zone, ward no. 10 work involving the construction of a drain wall and culvert, and the installation of a mesh screen over the drain at nala budhan sayyad (near the shaikh basti railway track and the municipal corporation girls inter coll

Read more
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise