Tender Details

Particulars Details
Title
Construction Of Four Lane Road Over Bridge (Rob No. 413) On New B.G. Line From Khurda Road Bolangir And Its Approaches At Km. 134.274 (Charichhak) Of Nh 57 In The State Of Odisha On Epc Mode
Description
Construction Of Four Lane Road Over Bridge (Rob No. 413) On New B.G. Line From Khurda Road Bolangir And Its Approaches At Km. 134.274 (Charichhak) Of Nh 57 In The State Of Odisha On Epc Mode
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_840407_1
Reference
Number
15 CE NH of 2024-25
Tender Fee 11800
EMD 65.59 Lakh
Tender Value
Place Charichhak
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=883391
Start Date December 19, 2024 14:30
End Date

15/04/2025 ( Expired 52 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Consultancy services for authority engineer for supervision of up-gradation of pichhore-dinara section of nh-346 from km 292.750 to 334.550 to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Consultancy services for authority engineer for supervision of up-gradation of pichhore-dinara section of nh-346 from km 292.750 to 334.550 to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode

Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise